Pregame Show
The 1996 Summer Olympics are still two years off, but Atlanta's painstaking preparation is in full swing. One key element is a carefully crafted construction program. The...

Civilian Structures: Taking the Defensive
The 1992 terrorist bombing of the World Trade Center in New York posed a challenging question to the engineering community: Can we design cost-effective structural systems for public and...

Alternative Habitat Concepts for the First Lunar Outpost
The First Lunar Outpost (FLO) Study was a NASA-wide effort to define systems for a near-term, low cost return to the Moon. The FLO habitat must support four crew on the lunar surface for...

A Microcomputer Model to Estimate the Benefits of Volume Generated Auxiliary Passing Lanes on Two-Lane, Two-Way Highways
Safety and operational characteristics of rural and suburban two-lane roadways can be substantially improved by the provision of adequate passing opportunity, especially as traffic volumes...

Optimal Cost Basis for Seismic Design
The paper summarizes a methodology for establishing seismic design levels based on a cost-benefit assessment. The methodology requires the development of costs and benefits for varying...

Systems Integration and Economic Aspects of the Universal Container System
Universal containers (UC) are multi-assembly spent fuel containers that are loaded and sealed at reactor sites or the first DOE facility. They are thereafter handled as clean containers...

Alternative Strategies?A Means for Saving Money and Time on the Yucca Mountain Project
The United States Department of Energy (DOE) is undertaking studies to determine the suitability of Yucca Mountain (YM) as a potential site for disposal of high-level nuclear waste. Yucca...

Non-Fuel Bearing Hardward Melting Technology
Battelle has developed a portable hardware melter concept that would allow spent fuel rod consolidation operations at commercial nuclear power plants to provide significantly more storage...

The Independent Cost Estimating Process
The United States Department of Energy (DOE) requires that an Independent Cost Estimate (ICE) be prepared for all Major Systems Acquisitions (MSAs); that is, projects or programs expected...

Nonmarket Economic Values for Salmon and Wildlife Resources
Until recently, resource economists primarily focused on measuring the direct net value of fish and wildlife resources, when analyzing management options. And the technical literature...

Glen Canyon: The Economic Costs
Revenues from power produced at Glen Canyon Dam are used to support Colorado River Storage Project (CRSP) purposes, to pay O&M costs, and to repay construction costs. Generation...

Estimating Maintenance Cost of Existing Stormwater Retention Ponds
The 280-acre Kensington Business Park includes 11 stormwater retention ponds that were also designed to provide aesthetic enhancement. Maintenance of these ponds became a concern when...

Agricultural Water Conservation Technology Transfer
Efforts to implement computer programs which encourage water and energy conservation in the Columbia Basin, are described. Irrigators use the irrigation scheduling program to receive recommendations...

The Evolution of Conservation Rates in Phoenix, Arizona
Conservation or increasing block rates first implemented in Phoenix, Arizona in 1982 were reexamined by a three year study involving Water Department staff, a Citizen Rates Committee and...

Storage/Treatment Isoquants for CSO Control Planning
A quantitative procedure which identifies the technically efficient combinations of storage volume and treatment rate necessary to achieve various levels of combined sewer overflows (CSO)...

A Stochastic Cost Engineering System (SCENS) Applied to Estimating and Tendering for Bill of Quantities Contracts
In many countries, contracts based on bill of quantities are very common in construction industry. Although estimating and tendering are overwhelmed by uncertainties, the common practice...

The Automation of Freeway Ramp Junctions Analysis
Congestion on urban freeways has been steadily increasing. In contrast, capacity expansion, by means of constructing new roadways, has not kept pace with the growth in demand. The primary...

Using Data Flow Diagrams to Study Communication Process Between Construction Project Participants
The Architecture-Engineering-Construction (AEC) industry is characterized as being highly fragmented. A large number of diverse organizations participate in the planning, design, and construction...

An Automated Cost Planning System (ACPS) for Construction Projects
This paper suggests an automated cost planning system (ACPS) for planning and scheduling construction projects. The major objective of this system is to further the use of CPM as a planning...

Computerized Approach for Forecasting the Rate of Cost Escalation
This paper reviews the treatment of escalation in construction costs. The causes of escalation are outlined and the effect of escalation on the contractor and the owner is discussed. Various...

 

 

 

 

Return to search