Joint Outfall H Relief Trunk Sewer System

See related content

by Surendra Anketell, County Sanitation Districts of Los, Angeles County, Whittier, United States,

Document Type: Proceeding Paper

Part of: Pipeline Infrastructure II:

Abstract: The Joint Outfall 'H' Relief Trunk Sewer System consists of the construction of 11.3 kilometers (7 miles) of polyvinyl chloride lined reinforced concrete pipe varying in diameter from 1200 mm (48 inch) to 2100 mm (84 inch). The entire project is expected to be completed by the end of 1993 at a cost of $16 million. The project includes several complex design and construction features as related to large diameter sewers.

Subject Headings: Sewers | Reinforced concrete | Concrete pipes | Chloride | Pipelines | Concrete construction | Structural design | Pipe joints |

Services: Buy this book/Buy this article


Return to search