Pit Turbines, an Economical Solution for Low Heads

by Douglas A. Spaulding, Warzyn Engineering Inc, United States,



Document Type: Proceeding Paper

Part of: Waterpower '89

Abstract:

The paper describes the experience with pit turbine design and construction at the 8 MW St. Cloud facility located on the Mississippi River in Minnesota. Major topics in the paper include energy comparisons of pit turbines with comparably sized 'S' units and comparisons of civil costs for powerhouse construction. The paper will also describe the results of the performance tests for the units.



Subject Headings: Hydro power | Power plants | Economic factors | Electric power | Comparative studies | Turbines | Electrical equipment | Construction equipment | Minnesota | United States | Mississippi River

Services: Buy this book/Buy this article

 

Return to search