An Overview of the Vitrification of Defense High-Level Waste at the Hanford Site
Nearly 63 percent of the nation's high-level nuclear waste has accumulated at the U.S. Department of Energy's (DOE) Hanford Site in Washington State. This accumulation...

The Long-Term Climate Change Assessment Task of the Protective Barrier Development Program for Low-Level Waste Site Remediation at the Hanford Site
A study plan is being developed to guide a multiyear program to assess long-term climate change and optimize the design of protective barriers. A protective barrier alternative is being...

Retrofitting a Regional Stormwater Facility
The City of Tacoma, Washington, constructed a regional stormwater detention facility in the Leach Creek watershed in 1961 to permit development in the southwest corner of the City while...

Groundwater Contamination from an Unlined, Poorly Capped Landfill
This paper presents a case study of groundwater and surface water contamination from a major, unlined, and poorly capped municipal landfill located in Western Washington. The landfill...

Using an Index Stream to Make Instream Flow Decisions
The paper discusses development of an Integrated Operating Plan (IOP) that uses an unregulated (natural) stream in the upper Cedar basin as an index of overall hydrologic status of the...

Validation of a Traffic Modeling System for Detour Planning
The Downtown Seattle Transit Project (DSTP) was initiated as an effort to relieve existing traffic congestion in downtown Seattle. It consists primarily of a 1.3-mile electric-bus tunnel...

Using GIS Techniques for Transportation Planning to Automate Compilation of Land Use Information
This paper describes a procedure used to compile land use or socioeconomic data for traffic analysis zones for input into a transportation planning model. The procedure uses a combination...

Predicting Overland Flow Response: Effects of Spatially-Varying Soil Properties
A physically-based model of Horton overland flow is applied to experimental data from a simulated rainfall event in eastern Washington. The model employs the Green-Ampt infiltration equation...

Intergovernmental Agreements in Watershed Planning
Management of the surface water system not only rests with state and federal agencies, but more importantly, with local jurisdictions. Recognizing this, a cooperative effort was undertaken...

Guard Gate Tests at Tieton Dam
The emergency gate hoist system on the guard gates at Tieton Dam, near Yakima, Washington, was tested as part of the United States Bureau of Reclamation Safety Evaluation of Existing Dams...

Lower Granite Fish Guidance Efficiency System Model Study?Snake River, Washington
With the annual migration of adult salmon up the Columbia and Snake Rivers and the migration of their offspring (juvenile salmon) downstream to the ocean, new problems have developed with...

Seattle Swing
The swing bridge has long been out of favor in the U.S. because of the navigational hazard presented by mid-channel pivot piers. A consortium of engineers is updating the design to a state-of-the-art...

Development of Hydraulic Structures
The Bureau of Reclamation was established in 1902. Since that time, Reclamation has constructed more than 220 dams. Each dam, depending on its function, has two or more principal hydraulic...

Field Performance of a Soil Nail System in Loess
This paper presents data from measurements of a soil nail system constructed in loess soil in Pullman, Washington. The soil nail system is designed to retain a 39.2 ft (11.9 m) high excavation...

Continued Development of the Columbia Basin Project?A Status Report
The Columbia Basin Project is located in central Washington State and encompasses approximately 1 million irrigable acres. Water from the project delivery system was first applied in 1952...

Flow Modeling in the Toutle River, Washington
In support of flow, suspended load, bed load, and bedform transport measurements, a quasi-three-dimensional river flow model was adapted to a reach extending from 260m upstream to 30m...

Settling Basin Model for the Personal Computer
The SETSIZE program, models sediment deposition in a settling basin. The program can be applied to determine the length of time until dredging or cleaning is necessary or solve for an...

Sedimentation in Mud Mountain Reservoir at High Discharge
Mud Mountain Dam is a single purpose flood control project completed in 1948 on the White River in the State of Washington. The White River drains the northern and northeastern slopes...

Hydraulic Design of Mud Mountain Dam Outlet Works Modifications
Mud Mountain Dam is a single-purpose flood control project located on the White River in western Washington State. The existing flood control outlet works consist of an upstream controlled...

Deposition at a New Dam Near Mount St. Helens
A sediment retention structure (SRS) is being constructed on the North Fork Toutle River in the state of Washington to trap sediments eroding off the 1980 Mount St. Helens debris avalanche....

 

 

 

 

Return to search