Conceptual Planning for Rehabilitation of the Boundary Hydroelectric Project

Upper Baker Turbine Repair

1-D or 2-D Models for River Hydraulic Studies?

In Seattle, It's Known as LOCE

Unsympathetic in Seattle

Analysis of Bank Stabilization in Steep Complex Streams Using A Two-Dimensional Model
In cases where the channel is fairly uniform, and not divided, one-dimensional hydraulic models, such as HEC-2, generally give adequate results for scour evaluations and bank protection...

Upper Chehalis River Pollutant Capacity and Load Allocations
Dry season water quality was evaluated in the Upper Chehalis River in western Washington state, focusing on low dissolved oxygen (DO), and using the Total Maximum Daily Load (TMDL) process....

Monitoring Scour at Bridge Piers in Snohomish Co., WA
Washington State, Snohomish County Public Works Department is using a new Fixed Mechanical monitoring device, to augment its current program of monitoring scour at bridge piers. The Public...

Two-Dimensional Modeling of River Dynamics for the Expansion of Clover Island, Kennewick, Washington
The Port of Kennewick, Washington, is proposing to redevelop Clover Island as a waterfront village concept. The island is located in the Columbia River between McNary and Priest Rapids...

Acquisition and Restoration of a Drainage District in the Snohomish River Valley
The purpose of this paper is to present an overview of the efforts by Snohomish County to acquire a drainage district (Drainage District 6) in the lower Snohomish River valley and restore...

Washington State's Stormwater Management Program
Significant progress has been made in developing a stormwater management program at the Washington State Department of Transportation (WSDOT). Topics highlighted in this paper include:...

The Costs and Benefits of Dam Removal on the Elwha River
The Elwha River is located on the Olympic Peninsula in the State of Washington. In the early 1900s two hydroelectric dams were built on the Elwha River. Construction of Glines Canyon and...

The Strategic/Master Plan at Boeing Field: A Means of Optimizing Airport Utilization at an Inner City Airport

Engineering and Construction for Sustainable Development in the 21st Century
Assessing Global Research Needs
Prepared by the Civil Engineering Research Foundation. This report identifies key engineering research and construction issues for the 21st century...

Washington Buildup
Despite its reputation as a city mired in fiscal crisis, Washington, D. C., continues to improve its basic infrastructure. A look at three ongoing projects—a sports arena, a waste water...

The Application of Time Domain Electromagnetics to a Regional Groundwater Investigation in Western Washington

Port of Seattle Terminal 5 Expansion and Redevelopment

Environmental Remediation and Redevelopment: The Port of Seattle's Southwest Harbor Project

Compatibility With Post-Cleanup Property Development As a Criterion to Shape Remedial Solutions: An Example From the Combined Remediation of the Port of Tacoma Blair Waterway and Blair Backup Properties Tacoma, Washington

1994 Port of Seattle Timber Study

 

 

 

 

Return to search