From Good to Great: The Evolution of Cutoff Wall Quality Control and Verification Techniques
The last three decades have brought tremendous improvements to quality control (QC) procedures for construction and post-construction verification of deep cutoff walls installed in active high-hazard dams....

Permeable Pavement Research Needs
The implementation of permeable pavement installations and practices are expanding and becoming more commonplace. With this increased usage comes expanded and improved information on design,...

Physical Model Verification of a Coastal Discharge

Environmental Technology Verification Report for the Plasma Enhanced Melter
Prepared by the Environmental Technology Evaluation Center (EvTEC), a service center of CERF/IIEC. This Technology Verification report describes the...

Environmental Technology Verfication Report for Installation of Silt Fence Using the Tommy Static Slicing Method
Prepared by the Environmental Technology Evaluation Center (EvTEC), a CERF Innovation Center. This verification report describes a field evaluation...

Design Analysis & Field Verification of Alameda Corridor Retaining Walls

Environmental Technology Verification Report for Ammonia Recovery Process
Prepared by the Environmental Technology Evaluation Center (EvTEC), a CERF Service Center. This report describes the nature and scope of an environmental...

A Three-Dimensional Non-Hydrostatic Model for Free Surface Flows: Development, Verification and Limitations

Validation and Verification of a Nonlinear Reinforced Concrete Structure Model Using Precision Test Data

Rock Grouting: Contemporary Concepts in Materials, Methods, and Verification

TDR Monitoring of Overburden Deformation to Verify Modeled Behavior

Field Data Collection and Modeling for Verification of an Ecosystem Model in Osaka Bay, Japan

Maximum Simulation Reliability for Three-Dimensional Flow Model Verification Using Multidimensional Response Techniques

Verification of Dynamic Soil-Pile Interaction

Containing the Cold War's Hot Waste
A new method for the construction, verification, and maintenance of underground vaults isolates and contains radioactive burial sites without excavation or drilling in contaminated areas....

A Merger Manual
Mergers and acquisition business deals continue to proliferate in the consulting engineer and construction industry. There are many important issues on both sides of the table, and the...

A Hybrid Prescriptive-/Performance-Based Approach to Automated Building Code Checking

EvTEC
A Collaborative Approach to Verifying Environmental Technology

Validation of Three-Dimensional Multigrid Wave Model Against Experimental Data

A Simple PC Based Significant-Wave Model

 

 

 

 

Return to search