Cliffside Correction
Construction of a 10 km sewer collector in Valparaíso, Chile, came to a halt due to construction difficulties experienced during pipe jacking operations. Analysis revealed not only construction...

Laboratory Pipe Box Testing to Simulate Toe Drain Performance

Do Coated Pipes Last Longer?
Field studies have revealed that polymer coated steel pipe resists corrosion longer than pipe coated with other materials. Corrosion is the most common failure mechanism of pipe culvert,...

Undersea Shield Tunnels of Trans-Tokyo Bay Highway

Inspecting the Unknown (Available in Geo-Environmental Special Issue Only)
Unknown foundations have plagued civil engineers for years. In the case of underwater pilings, much time and money is spent inspecting for cracks, breaks or deterioration. Even then, visibility...

Pipeline Route Selection for Rural and Cross-Country Pipelines
Prepared by the Task Committee to Rewrite Manual of Practice 46 of Committee on Pipeline Installation and Location of the Pipeline Division of ASCE ...

Pipelines in the Constructed Environment
This proceedings, Pipelines in the Constructed Environment, consists of papers presented at the 1998 Pipeline Division Conference, held in...

Undersea Pumped Storage for Load Leveling

Joint Agency Cooperation to Ensure Safety and Protection of the Environment Through Pipeline Inspections

Underwater Cracking of Prestressed Concrete Piles

Probing Pipelines (available only in Geoenvironmental Special Issue)
Inspecting underground pipelines has become easier, more effective and less intrusive through use of sonar, radar, lasers and seismic and acoustic testing. To replace simple visual inspection,...

A Response Based Method for Developing Joint Metocean Criteria for Seabed Pipeline Design

Wave Forces on Partially Submerged Pipe Breakwater

Inverse Chlorine Modeling in Pipe Networks

Pipe Network Optimization

Leachate Collection Pipe Cleaning Demonstration Project: A Full-Scale Example

Making Way for Water
The State Water Project Coastal Branch Aqueduct and Extensions brings 48,000 acre feet of water annually to 23 Southern California communities. built over five years, the project involved...

ASCE is Preparing a Pipeline Manual?

Outlet Repairs Using Cured-in-Place Pipe

Sediment Bypass System for Grove Dam, Nebraska

 

 

 

 