Large Kaplan Turbine Runner Replacement
Development of New Runner Designs by Example of Rehabilitation at Cabinet Gorge P.S.
A Parameter Study on Cavitation Performance of Francis Turbines
Cavitation Resonance in The Draft Tube of A Turbine
Discussion on Inflow and Outflow Conditions of a Hydro Turbine
Fluid Mechanical Design of the Potential Flow Turbine
Best Pump/Best Turbine: The Trade-offs with Pump/Turbine Upgrades
The Numerical Laboratory Gets Better
Recent Experience with Turbine Venting at TVA
Fish Injury and Mortality in Spillage and Turbine Passage
Design Considerations for a Large Kaplan Turbine Governor
Chaira Pumped Storage Now in Operation
Troubleshooting for Efficiency Improvements and Life Extension in Kaplan Type Turbines
Performance and Technical Particulars of the Double Runner Francis Turbines
3D Cam Controls: Operation, Installation and Benefits at The Dalles and John Day Dams in Northern Oregon
Recent Advances in Sonic Fish Deterrence
Next Generation Pumped Storage Development
Positioning for the Future: Hydro's Contribution in the Changing Electric Industry
Six Years of Monitoring the Effectiveness of a Barrier Net at the Ludington Pumped Storage Plant on Lake Michigan
Measurement of Turbine Pressures at TVA's Norris Hydro Project
Return to search