Cooling and Uprate Analysis of Hydro Generators
Fish Sampling and Monitoring Facility Layout at John Day Dam
Wanapum Kaplan Turbine Replacement
Hydroelectric Pumped Storage Technology
International Experience
This Committee report,
Plans for Testing and Evaluating the New Autoventing Turbines at TVA's Norris Hydro Project
As part of TVA's Hydro Modernization Program, the two 59-year old Francis turbines at Norris Dam have been upgraded with new units. In conjunction with TVA's...
The Importance of Water Depth for Sparger Performance
As part of TVA Hydro Modernization Program, the two 59-year old Francis turbines at Norris Dam have been upgraded with new units. In conjunction with TVA's Reservoir Releases...
On Silt Abrasion Erosion of Three Gorges Hydraulic Turbine in the Future
In this paper the basic parameters of Three Gorges hydraulic turbine have been reviewed and the operation characteristics of Three Gorges hydropower Station pointed out. Combined with...
Effect of Load Models and Limited Data on Load and Resistance Factors for Fatigue Design
Application of a Reliability-Based Fatigue Life Model to a Gas Turbine Engine Structure
Smooth Modelling of Oblique Contact with Friction of Turbine Blades: Behaviour Analysis Under Random Excitation
Moment-Based Probability Models for Wind Engineering Applications
Stability of a 26m free-yaw teetered wind turbine
Dissolved Oxygen Enhancement on the Provo River
Aeration of Hydroturbine Discharges at TIMS Ford Dam
Surface Water Pumps to Improve Dissolved Oxygen Content of Hydropower Releases
Development of an Operational, Full-Scale Fish Protection System at a Major Pumped-Storage Hydropower Dam
Evaluation of an Integrated Fish-Protection System
Fish Entrainment Studies—A Logistic Nightmare and How to Wake Up
Surface Attraction Fish Bypass at Rocky Reach Dam
Attraction Flow—A Fish Bypass Alternative
Return to search