Pressure-Time Flow Measurements Under Adverse Conditions
Theoretical analyses suggest that the pressure-time method is capable of accurately determining flow rate in the short, varying cross section, 'semi-scroll' penstocks...

Optimising Electric Power From a Small Scale Hydro Plant
The paper summarizes new development in electrical power generation from small scale hydro prime movers. It describes various methods of power generation such as CSCF (Constant speed constant...

Standard Safety and Control Concept for Double Regulated Small and Medium Hydro Turbines
The paper proposes a standard control concept for double regulated small and medium hydro turbines. The concept is based on minimum protection requirements for safe and reliable quick...

A Hydroelectric Plant Operator's Assistant
This paper describes a PC based application designed to assist in the process of enhancing the performance of multi-unit hydroprojects. Optimization considerations, uses of the Operator's...

Design Considerations for Radial Key Retrofit
A practise that is becoming more and more common is to retrofit hydro-electric generators with Radial Key Systems. There are significant design considerations that must be made to ensure...

Varying Generator Excitation to Control Draft Tube Surge
The Bureau of Reclamation recently experimented with varying the excitation applied to a hydroelectric generator to control power swings caused by draft tube surging in a Francis turbine....

Evaluation of Turbine Intake Velocity Criteria
The paper addresses the effect of intake flow distribution on turbine performance at low-head projects. Field and model test data are used to raise the question of whether typical turbine...

Hydraulic Transients in the Operation of Small Hydro Plants
Adequate governing stability is a primary consideration for most large hydroelectric generating units. However, almost all small units installed recently in the United States are intended...

Modernization of the Schoolfield Dam Hydroelectric Powerhouse
This case study describes the retrofitting of a turn-of-the-century powerhouse with modern turbine/generator equipment. The structure consists of numerous turbine bays separated by massive...

Manufacturing Planning 4 ? 440 MW Turbines Short Delivery
DBS Escher Wyss Inc. is building the largest turbines ever to be manufactured in Canada for the third expansion of the Tarbela project in Pakistan; four (4) Francis turbines each rated...

A Case Study, Large Versus Small
This paper will review the hydraulic comparisons between the Lock and Dam No. 13 Hydropower Project, a 33-MW, low-head generating station near Fort Smith, Arkansas, and the Murray Hydroelectric...

Sidney A. Murray, Jr. Hydroelectric Power Plant Turbine Hydraulic Design and Testing
This paper describes the project design concept, highlighting the choice of turbine type and capacity. Model testing and analysis of control by downstream gate is an important feature...

New Demands for Hydro Unit Inspection and Preventive Maintenance
As the hydro industry enters the 90's, special interest has been drawn to the fundamental practice of hydro unit inspection and maintenance. New demands on hydropower equipment...

Dardanelle Turbines
The Dardanelle turbines located at river mile 205.5 of the McClellan-Kerr Arkansas River Navigation System, are experiencing an unusual amount of wear in the blade trunnion bushings. Oil...

Total Quality Planning
When it comes to major unit maintenance, 'total quality results' require an investment in 'total quality planning.' The successful replacement...

Modernization of Hydroturbines?New Approach to Effectiveness, Reliability, Environment
Renovation of hydraulic turbines is one of the major lines in LMZ production and is aimed at rehabilitation of hydroturbines and increasing efficiency, rated output and energy production....

Composite Materials Show Promise for Clean Kaplan Runners
In order to prevent any possibility of oil leakage into river water, LMZ manufactured Kaplan runners containing oil in the blade servomotor only, while the blade operating mechanism operates...

R. H. Saunders GS?Propeller Turbine Runner Replacement Project Outline and Model Development
Ontario Hydro's operating philosophy is to operate all of its facilities in an optimum manner. The basic rationale for upgrading this plant is to maximize its energy potential...

Robert Moses Procurement and Model Tests ? A Contractor's Perspective
This paper discusses (1) the need to provide realistic cost/benefit evaluation criteria in turbine bid specifications and (2) the benefits of competitive model testing. Recent procurement...

Challenges in the Design and Manufacture of Small Replacement Runners
The increasing trend within the hydro industry to achieve additional capacity and/or energy through runner replacement has brought with it new challenges for the turbine manufacturer....

 

 

 

 