CIVIL ENGINEERING DATABASE
AMERICAN SOCIETY OF CIVIL ENGINEERS                       ASCE LIBRARY

 

A Review of TVA's Aeration and Minimum Flow Improvements on Aquatic Habitat

Update on Development of Auto-Venting Turbine Technology

Labyrinth Weir for Dissolved Oxygen Improvement

Rehabilitation of the High Dam Hydroelectric Facility

Pelton Turbine Jet Dispatcher

Standardization Guidelines for Planning and Conducting Turbine Entrainment and Survival Studies

Upper Baker Turbine Repair

Turbine Flow Measurement at Kariba Dam

Time Accurate Simulation of Free Surface Flow Problems

Increased Output of Old Power Plants - Limitation and Problems to be Solved

The Analysis of Rotor-Stator Interaction Phenomena in a Pump-Turbine

Head Recovery in the Tailwater of Low Head Hydro Power Stations

Juvenile Fish Passage System at McNary Dam

Status and Vision of Turbine Aeration

Numerical Analysis of Unsteady Flow on Rotating Buckets for Optimal Operation of Pelton Turbines

British Columbia Hydro's Commitment to the Environmental Movement: Puntledge River Hydro Intake Facility

Runner Wear Survey - A 3D Approach

Risk Analysis for Non-Routine Shutdown of Hydroelectric Generating Stations

Lessons Learned and the Rehabilitation of the Historic Norris Hydro Plant

Yale Hydroproject Upgrade

 

◄ Previous 1 [2] 3 4 5 6 7 8 9 10 ... Next ►

 

 

 

Return to search

 

Copyright © 1996 - , American Society of Civil Engineers

Contact Us | Terms | Help | Privacy