Wind Power in Antarctica—Case Histories of the North Wind HR3 Wind Turbine
The combination of extreme weather conditons and remoteness of the Antarctic sites makes them even better suited for wind turbine installations since the alternative power sources are...
Hydrogen Sulfide in Hydropower Reservoirs
Hydrogen sulfide is toxic to aquatic life and corrosive to construction materials at concentrations that are considerably lower than detection limits of analytical procedures commonly...
Side Effect of the Cross-Flow Turbine: Improved Water Quality
The working principle of the Original Cross-Flow Turbine with draft tube demands air induced into the turbine housing to operate at high efficiency. Reoxygenation of water will occur,...
Relative Survival of Juvenile Chinook Salmon Through Bonneville Dam on the Columbia River
Preliminary results of a multiple year study indicate that juvenile chinook salmon passing through the juvenile bypass system at Bonneville Dam second powerhouse during the summer have...
Effects of Hydroelectric Turbine Passage on Fish Early Life Stages
Turbine-passage mortality has been studied extensively for juveniles and adults of migratory fish species, but few studies have directly quantified mortality of fish eggs and larvae. An...
Fish Entrainment and Mortality at the French Landing Hydroelectric Powerhouse
This case study explains the fish mortality study performed and results obtained at an existing hydroelectric powerhouse in Michigan. Undertaken in 1989 and 1990, this study provides data...
In-Mine Hydroelectric Power Generating Station
Mines in the world are continually descending to greater depths in the search of mineral deposits. Water and energy usage are crucial to expansion. To help deal with this problem, Freeport...
Calculation of Three-Dimensional Turbulent Flow in Francis Turbine Runner
A numerical scheme, based on MacCormack's predictor-corrector explicit finite volume method, for solving three-dimensional weakly compressible inviscid, laminar, and turbulent...
Design of Powerhouse Spiral Case Considering Three-Dimensional Action
A commonly used approach of designing semi-spiral cases for Kaplan turbine installation using two-dimensional frames becomes unsuitable for large diameter turbines and/or high heads. The...
Digital Governor Application — Bradley Lake Project
The Bradley Lake Project has two impulse turbines rated at 60 MW each to provide power to the Railbelt region of Alaska. Solid state digital governors are utilized to respond to system...
Deflector Synchronizing and Governing
This paper is a survey of deflector control speed govern impulse turbines for synchronization to a grid, and for isolated operation. There are several advantages to deflector control versus...
Optimising Electric Power From a Small Scale Hydro Plant
The paper summarizes new development in electrical power generation from small scale hydro prime movers. It describes various methods of power generation such as CSCF (Constant speed constant...
Standard Safety and Control Concept for Double Regulated Small and Medium Hydro Turbines
The paper proposes a standard control concept for double regulated small and medium hydro turbines. The concept is based on minimum protection requirements for safe and reliable quick...
A Hydroelectric Plant Operator's Assistant
This paper describes a PC based application designed to assist in the process of enhancing the performance of multi-unit hydroprojects. Optimization considerations, uses of the Operator's...
Varying Generator Excitation to Control Draft Tube Surge
The Bureau of Reclamation recently experimented with varying the excitation applied to a hydroelectric generator to control power swings caused by draft tube surging in a Francis turbine....
Field Tests of a Lewiston Pump-Generating Unit
An extensive field test program was undertaken on a Lewiston Pump-Generating Plant (LPGP) unit at the Niagara Power Project, owned and operated by the New York Power Authority. The objective...
Evaluation of Turbine Intake Velocity Criteria
The paper addresses the effect of intake flow distribution on turbine performance at low-head projects. Field and model test data are used to raise the question of whether typical turbine...
Hydraulic Transients in the Operation of Small Hydro Plants
Adequate governing stability is a primary consideration for most large hydroelectric generating units. However, almost all small units installed recently in the United States are intended...
Modernization of the Schoolfield Dam Hydroelectric Powerhouse
This case study describes the retrofitting of a turn-of-the-century powerhouse with modern turbine/generator equipment. The structure consists of numerous turbine bays separated by massive...
Manufacturing Planning 4 × 440 MW Turbines Short Delivery
DBS Escher Wyss Inc. is building the largest turbines ever to be manufactured in Canada for the third expansion of the Tarbela project in Pakistan; four (4) Francis turbines each rated...