Keeping Tabs on Two Tunnels (available in Geoenvironmental Special Issue only)
Engineers devised a unique liquid level monitoring system to check vertical movements in 90-year old twin subway tunnels. Construction for the Boston Central Artery/Tunnel project requires...

Design and Construction of the First Bored Tunnel Under the Nile River

Surface Motion Above an Arbitrarily Shaped Tunnel Due to Elastic SH Waves

Seismic Soil-Structure Interaction Analysis for Immersed Tube Tunnels Retrofit

Close-In Blast Design at the Tri-Met Light Rail Tunnels

The San Francisco Connection
An underground switchyard and storage facility for San Francisco's Municipal Railway challenged the limits of both cut-and-cover and tunneling in loose soil. The project was...

Public Outreach and Construction Strategies for the Mission Trails Pipeline and Flow Regulatory Structure

The Use of Submersible Remotely Operated Vehicles for the Inspection of Water-Filled Pipelines and Tunnels

Geotechnical Investigations for Tunneling & Pipe Jacking

Overcoming the Challenges of Replacing 20 km of Defective 1524 mm Diameter PCCP

North City Tunnel Connects to New Water Reclamation Plant

Construction Challenges for Soft Ground Tunneling

San Diego's Conveyance Tunnels: A Historical Perspective

A Tiltable Windtunnel for Investigating Icing of Planar Surfaces

Practical Applications of Probabilistic Estimating in Schematic Designs

Three P's of Mega Project Control: Past, Present and Planned

Grouting of TBM Rock Tunnels for the Los Angeles Subway

Jet Grouting for the 63rd Street Tunnel

Geotechnical Instrumentation for a Megaproject

The Development of a Baseline Design for Jacking Highway Tunnels beneath Mainline Tracks at Boston's South Station

 

 

 

 

Return to search