Machine Performance
Annular Thickness, Annulus, and Annular Space; Overcut; Slurry or Auger System; Cutter Wheel Design and Select; Slurry Separation Plant; Buried Objects and Obstruction; Steering....

Submittals
The contractor should submit the items listed in the specifications for review and acceptance by the engineer. The submittals are generally divided into preconstruction and postconstruction...

Shafts/Temporary Structures
Shafts should be of a size to accommodate the equipment and pipe selected and to allow for safe working practices. If the shaft must accommodate the permanent works, it is the contractor's...

Construction Support Services
A preconstruction survey of existing structures within the anticipated construction zone of influence should be conducted before any construction begins. A plan for structures that need...

Regulations
The contractor should meet federal, state, and local regulations. The contractor is responsible for jobsite safety....

Restoration and Cleanup
The contractor should be responsible for site restoration and keeping the construction site clean, neat, and orderly at all times....

Measurement and Payment
The owner shall establish a bid schedule to obtain pricing for all work associated with the microtunneling installation. This bid schedule provides the bidders the opportunity to establish...

The Hail Problem
Unlike some other forms of precipitation, hail comes in bursts of short duration, falls over isolated and unpredictable locations, and usually occupies only a small percentage of the total...

Failure of a Twenty-Foot High Retaining Wall
A cantilever retaining wall, designed in apparent accord with provisions in a civil engineering handbook, failed soon after construction. Analyses of the causes of the failure are presented....

Effective Stress Theory of Soil Compaction
The shape of the moisture-density curve obtained from compaction tests has been explained in terms of capillarity and lubrication, viscous water, and physico-chemical interactions. None...

Application of Model Pile Tests to Axial Pile Design
Experiments conducted with instrumented model pile segment probes at Harvey and Empire, Louisiana are summarized and the observed behavior interpreted. Correlations are developed for the...

Managing Geotechnical Assets to Improve Highway System Performance
As geoprofessionals, we have a great opportunity to look at our work in new ways and to show its value to others. Highway agencies are looking to get the most from their assets and with...

Condition Indices, Performance Measures, and Managing Performance Data for Geotechnical Asset Management – Don't Get Buried!
Why don't transportation agency assets like pavements, bridges, and earthwork have a Check Engine light? Why can't you simply pull up the complete history and...

Asset Management of Earth Retaining Structures: Design through Design Life
Regarding new earth retaining structures (ERS) construction, the message is clear: plan for asset management. New construction is certainly not immune to performance issues, and the time...

Risk-based Methods for Geotechnical Features in Transportation Asset Management
The purpose of asset management is to meet life cycle performance goals through the management of assets in the most cost-effective manner. In developing risk-based, asset management plans...

So, Why Do You Want to Write a GBR?
Since 1974, scores of papers, articles, conferences, and legal documents have been dedicated to explaining how to write and/or how to use a Geotechnical Baseline Report (GBR). But the...

The Transbay Transit Center: Breaking New Ground in Urban Geotechnics
A building boom centered around the construction of the new Transbay Transit Center (TTC) is transforming the South of Market neighborhood in downtown San Francisco, newly dubbed the Transbay...

Challenges and Risks of Jet Grouting in a Congested Urban Environment
In the heart of London, one of Europe's largest jet grouting contracts is nearing completion. The jet grouting is part of the overall 7-year-long upgrade project to London...

Design-Build and Public-Private Partnerships: Risk Allocation of Subsurface Conditions
Project Owners, especially in the public sector, are exploring and utilizing alternative project delivery methods, such as design-build (D-B) and public-private partnerships (P3s). Some...

Communicating Risk in Geotechnical Engineering Practice
Three project situations are articulated with specific emphasis on an element of uncertainty or risk unique to each....

 

 

 

 