Design of Submarine Pipelines Against Upheaval Buckling
This paper describes part of a comprehensive joint-industry project on upheaval buckling. It develops a semi-empirical simplified design method and detailed design methods based on a new numerical analysis,...

Appraisal of Lightweight Moorings for Deep Water
This paper outlines the potential advantages of using lightweight fiber ropes for mooring floating production platforms. The influence of tether properties on mooring system response is discussed. It is...

Fire in the Hole: Emergency Repairs to the Robinson Creek Tunnel
On the eve of April 26, 2014, an arsonist set fire to the CSX Transportation (CSXT) Robinson Creek tunnel. The tunnel is located about 120 mi. southeast of Lexington, near Pikeville, KY. The 742-ft-long...

When Old Meets New: Railway Geotechnics and Remote Sensing
Railroad track, like any other built structure, relies on a foundation of geomaterials for support. In its most basal form, the railway track is quite simple: steel load-bearing members (rails) supported...

Railroad Tunnel Clearance Improvement and Linear Replacement: What Happens with Unexpected Ground Conditions during Tunnel Construction?
To increase the capacity and efficiency of transporting waste by rail to an existing landfill, Enviro Solutions Inc., the landfill owner, and CSX Transportation (CSXT), the rail line owner, sought the...

Railway Geotechnical Asset Management in Great Britain: How Modern-Day Techniques Help Monitor Railway Infrastructure Dating to the 1800s
This article discusses asset management, risk management, and earthworks failures as experienced by Network Rail (NR), the owner, operator, and asset manager of the majority of the rail network of Great...

What Does the Crystal Ball Say? Energy and Water Issues Are Too Great to Ignore!
Over the past 15 years, the Geoprofessional Business Association's (GBA) Emerging Issues and Trends Committee has held a series of Crystal Ball Workshops (Workshops) to identify long-term emerging issues...

Restoring Steinbeck's Carmel River: The Removal of San Clemente Dam
If you've read John Steinbeck's 1945 classic "Cannery Row," then you're already familiar with the Carmel River, which he described as "…a lovely little river. It isn't very long, but in its course it has...

Whose "Fault" Is This? Overcoming Faulting and Ancient Landslides in a Dam Abutment
The Calaveras Dam Replacement Project (CDRP) is the largest project in the San Francisco Public Utilities Commission's (SFPUC) $4.8 billion, multi-year Water System Improvement Program (WSIP). The program...

Dam Safety Management Using Risk-Informed Decision-Making Methods: A Powerful Tool or an Unnecessary Venture?
This article discusses design standards, safety methods, and risk-informed decision-making methods for dams....

The Case for Tolerable Risk Guidelines to Manage Flood Risk: Nature Bats Last
Since ancient times, people have used levees to reduce flood risk. We have built over 30,000 miles of levees in the U.S., largely on the belief that levies will unconditionally protect people who live...

Tailings Dam Engineer of Record (EoR): There's Nothing Conventional About It
Engineer of Record (EoR) is a simple and resolute concept that's applied throughout the western world for civil works construction. It's a term that fits in a nice neat box; it represents a single person...

Open Pit Geotechnics: Designing Slopes for a Very Deep Hole
For most hard rock surface mining operations, the development of an open pit is required to extract the ore resource. In designing an open pit, the challenge is to develop the most cost-effective pit slopes...

Where Geosynthetics Meet Mining Geotechnics: Part of the Mining Engineer's Toolbox
From enhancing stability to providing environmental containment, geosynthetic materials play an important role in mining projects and geotechnics in general. While often overlooked, advancements in geosynthetic...

Journal of Transportation Engineering, Part B: Pavements
The Journal of Transportation Engineering, Part B: Pavements will contain technical and professional articles on the planning, design, construction, maintenance, and operation of airport, roadway and other...

Journal of Transportation Engineering, Part A: Systems
The Journal of Transportation Engineering, Part A: Systems contains technical and professional engineering articles on the planning, design, construction, operation, and maintenance of air, highway, rail,...

Wider and Deeper (part of "A Greater Wonder")
A key component of the recent Panama Canal expansion involved the widening and deepening of Gatun Lake, the artificial lake that serves as the canal's reservoir, and the deepening of the Culebra Cut (also...

Raising Gatun Lake (part of "A Greater Wonder")
Raising the maximum operating level of Gatun Lake was one of the four main undertakings of the Panama Canal expansion project. Its goal was to increase the storage capacity for water used for human consumption...

Testing the New Locks (part of "A Greater Wonder")
The recently completed third set of locks at the Panama Canal incorporates several civil components and hydraulic design features that are intended to reduce routine maintenance and conserve water. For...

Guidelines for Construction Vibrations: How Much Rattle is Too Much?
The study of construction/blast-related ground vibrations on structures, people, and objects is a surprisingly diverse field. Vibration sources vary from blasting, all types of construction equipment,...

 

 

 

 

Return to search