Spatial Decision Support System for River Basin Management
MODSIM is a generalized river basin network flow model designed to simultaneously assure that water resources are allocated according to physical, hydrogeological, and institutional/administrative...

Application of Simulated Annealing for Integrated Urban Water Systems: Infrastructure, Treatment and Re-Use Optimization
Escalating costs in providing water supply, waste water and storm water infrastructure and community concerns over the environmental impact of water harvesting and effluent disposal, have...

Buffalo Cove Water Management Unit, Atchafalaya Basin, LA: A Case Study
The Atchafalaya Basin is a system undergoing change in topography and subsequently, hydraulics and hydrology. The U.S. Army Corps of Engineers funded and constructed an initial small-scale...

Geotechnical Testing, Observation, and Documentation
A geotechnical report, field and laboratory testing, as well as observation and documentation are all integral parts of most geotechnical projects. A technician is usually dispatched to...

Project Team Leadership
In the research lab, design office, fabricating shop, or on construction site, it is the project manager (PM) who must pull diverse talents and personalities into a project team. Depending...

Design and Construction of a Jet-Grouted Excavation Support Wall in an Urban Environment

Coupled Three-Dimensional Analysis of the Slab Foundation for the Magnetic Levitation Tranportation System (TRANSRAPID) in Germany

An Innovative Stormwater Management Project in Sydney, Australia
Presented in this proposed paper will be derails of a project implemented in Sydney, Australia aimed at addressing this need for information regarding the implementation and effectiveness...

Managing Infrastructure Assets

Leadership and Management in Engineering
Leadership and Management in Engineering, a publication of the Committee on Professional Practice, examines contemporary issues and principles of leadership and management. The focus is on understanding...

Capstones of 20th Century Construction
The 75th Anniversary Record of the Construction Division, ASCE 1925-2000

I-15 Highway Reconstruction - Design-Build: Risk/Reward for Contractor and Challenges for Geotechnical Engineer

Subsurface Information for Construction Contracts - Impacts on the Geoprofessional Community

Geotechnical Planning, Design, and Construction for the Cape Hatteras Light Station Relocation

Traffic-Calming Basics
The use of traffic calming measures, such as speed humps, traffic circles, and lane narrowings, is becoming more popular in the United States as a way to reduce vehicle speed and traffic...

Urban Planning and Development Applications of GIS
Sponsored by the Geographic Information Systems Subcommittee of the Urban Planning and Development Division of ASCE. This report provides the most...

Open Forum on Construction Failures

Soil Sampling
This manual addresses the principles, equipment, procedures, limitations for obtaining, handling, and preserving soil samples for geotechical investigations in support of civil and military...

Designing Better Managers
Designers traditionally have been hired for their technical and creative skills, but in the current tight labor market, they are increasingly taking on the role of project manager, especially...

Application of Water Column Dampers to Control Motions of the Wall Centre, Vancouver
The Wall Centre, a 450 foot tall high-rise tower currently under construction in downtown Vancouver will be the highest building to be constructed in that city. Wind tunnel testing indicated...

 

 

 

 

Return to search