Communicating Acceptable Risk Analysis - An Owner/Engineer's Perspective
Testing a Multi-Tiered Stress-Gradient Model for Risk Assessment Using Sediment Constituents from Coral Reef Environments
Coral reefs are threatened worldwide by stresses ranging from local to global in extent. Local stresses range from boat/ship groundings and sewage outfalls to dredging and coastal clearing....
Establishing Baselines For Pipeline Condition Master Planning
As our most of our cities approach complete built-out and much of our wastewater pipelines near the end of their design life, attention needs to be focused on retiring deteriorated first...
Geo-Strata
Focusing on geotechnical projects that use unique techniques and innovative processes, the magazine provides the everyday, real world details that geotechnical professionals need to know. Geo-Strata is...
Attapulgite Usage In Environmental and Geotechnical Construction
Emergency Warning System for Excavating at the Toe of a Dam
Measure the Crack Instead of Construction Vibrations
Early Age Properties of Shotcrete
Wastewater Trickling Filter Sinkhole Remediation with Limited Mobility Displacement Grouting
Ground Water Influence on Cutslope and Sidehill Embankment Constructions
Full-Scale Testing of Developed Hybrid Foundation
Case History of Ground Improvement for Construction and Hydrotesting of a Large LNG Tank in Puerto Rico
Jet Grouting for Microtunneling and Shaft Construction in Highly Congested Utility Corridors
Lime Cement Columns for the Reconstruction of Interstate 15 in Salt Lake City, Utah
Embankment Construction in an Urban Environment: The Interstate 15 Experience
Ground Improvement Feasibility Reports for Large Highway Projects: A Case Study of the Woodrow Wilson Bridge Replacement Project
Bell's Bridge Rehabilitation
Bell's Bridge carries Tidewater Drive, a major urban arterial in the City of Norfolk, Virginia, over Wayne Creek, a tributary of the Lafayette River. During a routine inspection in 1995,...
Seismic Analysis and Retrofit of the Amoskeag Bridges
In 1983 AASHTO first offered the design guide for seismic analysis of bridges, which ultimately became a permanent part of the AASHTO Bridge Design Manual in 1990. Prior to this time,...
Rehabilitation of the Packers Falls Bridge
The Packers Falls Bridge was constructed in 1912 and consists of a 42' (12.8m) single span, reinforced concrete arch structure. This bridge was constructed using a unique forming system...
A Guide for Best Management Practice (BMP) Selection in Urban Developed Areas
With the ongoing NPDES Stormwater Permits, TMDL programs, and the increase in environmental awareness, many municipalities are challenged to address the relatively new concept of cleaning...
Return to search