Big Digs Around the World
This proceedings, Big Digs Around the World, consists of papers presented at sessions sponsored by the Geo-Institute of ASCE held in conjunction...

An Introduction to Taipei Suburban Sewage Collection and Treatment Systems
Taipei Suburban Sewerage System covers the lower Tansui River Basin located in Northern Taiwan The planning area (excluding Municipality of Taipei) consists of 14 township in Taipei County...

Development of Transport Model for Groundwater Planning and Management in Taipei Basin
The objective of this paper is to develop a groundwater model for contaminant transport simulation. The transport model, in conjunction with the previously developed flow model, is used...

MRT Cable Supported Roof
A cable supported roof structure for Chientan station (R18A) at Taipei Mass Rail Transit system's Tan-Sui line are under construction. Unique wind and cross sectional dynamic effect has...

A Log-Triangular Design Hyetograph for Stormwater Management
A method is developed to generate a log-triangular design hyetograph from historical rainfall data. The method considers the characteristics from other commonly used methods for design...

Development of a Two-Layered Groundwater Model for the Taipei Basin
The objective of this paper is to develop a groundwater model for flow simulation in the Taipei basin. A conceptual model of the basin is first developed; the model consists of an upper...

An Optimal Parameter Estimation Model for Groundwater Resource Management
An optimal parameter estimation model is developed to identify the locations of wells, to determine pumping magnitude, and to calculate transmissivity coefficients in a confined aquifer...

Developing an Air Transportation Hub?A Planning and Analysis Process and its Application in Taiwan, R.O.C.
The Ministry of Transportation and Communications of the Republic of China in Taiwan wanted to know whether it was feasible and desirable to develop an air transport hub at Chiang Kai-shek...

Taipei Trade
The appearance of this building is remarkable�so were the cost savings. A design change form rigid shear walls to a ductile frame helped keep construction of Taipei's World...

Air Slot in Tunnel Spillways of Feitsui Dam
The tunnel spillway of the Feitsui Reservoir Project near Taipei has a head drop of more than 110 m, and maximum discharge of 1,500 cms. For prevention of cavitation in the tunnel, an...

 

 

 

 

Return to search