From Good to Great: The Evolution of Cutoff Wall Quality Control and Verification Techniques
The last three decades have brought tremendous improvements to quality control (QC) procedures for construction and post-construction verification of deep cutoff walls installed in active high-hazard dams....

Working Platforms for Specialty Geo-Construction
A major cause of rigs toppling over is the state of the "working platform" that they must work from. A working platform is a layer of material, often compacted sand or gravel, placed over the subgrade,...

Your Numerical Model Begins at the Site Investigation — Phase Improving the Suitability of Numerical Geotechnical Modeling
The success of an advanced geotechnical numerical analysis depends foremost on a thorough geologic and geotechnical understanding of the site, and thus the geometric definition and adequacy of input parameters...

Moving Down the Road of Progress: Geosynthetics Subdue Failures on Expansive Clays and Frost-susceptible Soils
Using geosynthetics in roadway projects has provided sustainable alternatives for reconstruction and maintenance and now represents a significant portion of the total geosynthetics market. Geosynthetics...

Site Constraints Complicate a Bulkhead Replacement: It Takes a Team to Overcome the Challenges
North American Aggregates (NAA), a leading supplier of aggregates in the New York area, recently constructed a new processing facility in Perth Amboy, NJ. One of the final components of the new facility...

The investigations: The World Trade Center towers
On Aug. 21, 2002, the National Institute of Standards and Technology announced it would conduct a building and fire safety investigation of the World Trade Center disaster. This investigation was conducted...

Composite Special Moment Frames
Wide Flange Beam to Concrete-Filled Steel Column Connections
Prepared by the Composite Construction Committee of the Metals Technical Administrative Committee of the Structural Engineering Institute of ASCEComposite Special Moment Frames: Wide Flange Beam to Concrete-Filled...

Journal of Transportation Engineering, Part B: Pavements
The Journal of Transportation Engineering, Part B: Pavements will contain technical and professional articles on the planning, design, construction, maintenance, and operation of airport, roadway and other...

ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
The journal will meet the needs of the researchers and engineers to address risk, disaster and failure-related challenges due to many sources and types of uncertainty in planning, design, analysis, construction,...

Evaluating Bridges With Unknown Foundations for Susceptibility to Scour: North Carolina Applies Risk-Based Guidelines to Over 3,750 Bridges
Scour occurs when flowing water removes erodible material such as sand and rock. For bridges over water, scour affects the stability of pier and abutment foundations and contributes to...

Geotextile Tube Dewatering
Geotextile tubes are made of high-strength, permeable geotextile that, when filled with a slurry, allow water to drain from the tubes while retaining the solids. They can be prefabricated...

Permeable Interlocking Concrete Pavement (PICP)
Permeable interlocking concrete pavement (PICP) consists of (impervious) manufactured concrete units that form permeable voids and joints, when assembled into a laying pattern. The openings...

Grid Pavement
Open grid pavements consist of concrete or plastic units with large surface openings filled with a permeable joint material, typically small aggregate (ASTM No. 8 or No. 89), sand, or...

General
Design of Latticed Steel Transmission Structures specifies requirements for the design, fabrication, and testing of members and connections for electrical transmission structures. These...

Project Layout
Microtunneling projects should be laid out with attention to the benefits and constraints unique to this construction process. The following recommendations address some of these concerns:...

Field Aspects
As soon as practical after their arrival at the project site, all pipes, fittings, and appurtenances should be thoroughly checked for compliance with the contract documents and accepted...

Innovations in Geosynthetic Rolled Erosion Control Products: From Forests to Fibers
Over the last 50 years, many different types of geosynthetic rolled erosion control products (RECPs) have emerged, ranging from different structure types to different fiber types. Natural-fiber...

Porous Asphalt and Permeable Friction Course Overlays
Porous asphalt typically consists of conventional warm mix asphalt (WMA) or hot mix asphalt (HMA) with significantly reduced fines resulting in an open-graded mixture that allows water...

Geosynthetic Materials Help Build Optimized Infrastructure
In recent years, the world has begun to realize the negative impacts that limited infrastructure can have on economic growth and the well-being of humankind. Our infrastructure challenges...

Mechanisms Controlling the Permeability of Clays
Coefficients of permeability, calculated using Terzaghi's theory of one-dimensional consolidation, are reported for smectite, illite, and kaolinite, in water, methyl and ethyl...

 

 

 

 