Permanent Sensors Turn Construction Project into Long-term Research Study (part of "Room To Grow")
The Centre for Smart Infrastructure and Construction (CSIC) at Cambridge University, in conjunction with Arup, has placed fibre-optic cables that will serve as permanent sensors on the underground structure...

Seismic Data from Smartphones: MyShake: Building a Global Smartphone Seismic Network
Increasing the density of earthquake-monitoring instruments at a fast rate and at a low cost is a dream for many researchers who study earthquakes. MyShake, a smartphone application developed by the Berkeley...

Eyes in the Heavens: Satellite Technologies in Remote Site Monitoring
Installation and maintenance of instrumentation to monitor geotechnical projects in remote locales is usually more challenging than sites in urban areas for both technical and logistical reasons. In most...

Geotechnical Instrumentation for Roadways: Shifting from Manual to Automated
Geotechnical instruments, including inclinometers, piezometers, settlement plates, etc., have long been used during and after construction to monitor performance of transportation infrastructure, including...

Achieving Success and Avoiding Failures with Permeable Pavements
This chapter provides experienced-based recommendations on how to achieve success with permeable pavements. This information is based on an informational survey completed by designers,...

Site Conditions
The owner and the engineer should visit the proposed site during the initial planning phase and periodically throughout design to identify site conditions and constraints. A survey of...

Detailed Site Investigations
This section addresses site investigation issues that are important for detailed design and construction of microtunneling projects. These site investigations include the following: Geotechnical...

Construction Support Services
A preconstruction survey of existing structures within the anticipated construction zone of influence should be conducted before any construction begins. A plan for structures that need...

Instrumentation and Monitoring
A detailed plan for monitoring possible ground surface movements caused by the microtunneling operations should be prepared. The plan is typically prepared by the engineer in consultation...

Evaluation of Hail Suppression Efforts
The rationale for conducting project evaluations is to find out how successful the operations are in achieving the desired results. This assessment is more easily said than done. It is...

Application of Model Pile Tests to Axial Pile Design
Experiments conducted with instrumented model pile segment probes at Harvey and Empire, Louisiana are summarized and the observed behavior interpreted. Correlations are developed for the...

Geotechnical IT Revolution: Intelligent Compaction and Beyond
The explosion of innovative developments in the IT industry is making many of us geotechnical engineers green with envy. We want some new technology, too! Luckily, advances in sensors...

Determining the True Distributions of Load in Instrumented Piles

In Situ Strength Assessment Using Full Flow Penetrometers

Accuracy Assessment of the National Geodetic Survey's OPUS-RS Utility

Port of Barcelona Expansion: Global Instrumentation Program

The Engineering Income and Salary Survey Standard Report
Trends Analysis, Policies, and Practice
The Salary Survey of 2010 is an engineering income and salary survey....

The Engineering Income and Salary Survey
Trends Analysis, Policies, and Practices
The Salary Survey of 2009 is an engineering income and salary survey....

Dilatometers Settle In
(Originally published in Civil Engineering, 1988, March, 68-70.)...

Innovations in Field Instrumentation: Revelations, Insights, and Observations from the Seventh International Symposium on Field Measurements in Geomechanics

 

 

 

 

Return to search