Beneath The Surface
Investigations related to subsurface utility engineering (SUE) traditionally have been used on linear infrastructure projects to provide detailed utility information within the public right-of-way. As...

Storage for One More Century
Since its completion more than a century ago by a previous owner, Denver Water's Antero Dam has experienced seepage problems, forcing the utility to limit the storage capacity of the associated reservoir....

Three Sources, One Quality Product
To keep pace with increasingly stringent regulations and growing demand, Lee County Utilities in southwest Florida recently constructed a new, larger drinking water facility that treats three separate,...

Under-Slab Utility Installation with Aggregate Piers: It's All About Planning
Aggregate pier ground improvement is commonly used in North America to support buildings. The technology has expanded in the last decade thanks to refinement and introduction of new techniques, more rigorous...

The Present And Future Of Virtual and Augmented Reality In Geotechnical Engineering: This Technology Has Gone Way Beyond Gaming!
One of the greatest challenges with subsurface construction has always been our relative inability to visualize underground conditions that are often comprised of spatially variable soil and rock strata,...

Avoiding Impacts of Collapsed Mines on Railways: A Multidisciplinary Geophysical Detective Approach
The presence of abandoned mine workings can pose a significant risk to the use and development of surface structures above them, including railway lines. Typically, the adverse and often sudden effects...

Using Geophysics to Assess Geohazards Before Construction: Increase Your Odds for Success!
Understanding subsurface conditions is the key to any successful construction project, including new construction, excavation, and drilling. The consideration and understanding of the subsurface geology...

Poison Oak, Mistakes, And Lessons: Tales of Geofailure Investigations
When things go wrong in geotechnical engineering — like ground movements and earthwork construction delays — failure investigations are often performed. In a typical geotechnical project, the path is relatively...

Lightweight Alternatives for Embankments on Soft Ground: A Focus on Railway Systems
Lightweight material for civil engineering application is primarily used for accelerated roadway and bridge approach construction, settlement mitigation, utility and tunnel abandonment, reduction of static...

The New Lightweight Contender: Ultra-lightweight Foamed Glass Aggregate Finds the U.S. Market
Geotechnical engineers are often confronted with sites where the existing soil is prone to settlement or where there are subsurface utilities sensitive to additional load. If relocation or realignment...

Whose "Fault" Is This? Overcoming Faulting and Ancient Landslides in a Dam Abutment
The Calaveras Dam Replacement Project (CDRP) is the largest project in the San Francisco Public Utilities Commission's (SFPUC) $4.8 billion, multi-year Water System Improvement Program (WSIP). The program...

Claims against Geotechnical Engineers: Getting it Right in the Midst of Uncertainty
Geotechnical engineering is one of engineering's riskiest professions, prone to litigation due to the inherent uncertainty associated with characterizing the subsurface. Site investigations rarely provide...

Borehole Geophysics: Tools to Characterize Rock Properties
Effective design and construction in rock requires characterization of the engineering properties of the rock mass, as well as any associated geological features such as joints, faults, and bedding planes....

Stabilizing Variable and Sloping Ground: Achieving Innovation Through Adaptation
We all know the high price of land development these days, so it's more important than ever for owners and their designers to maximize available land area. Occasionally, this demand is constrained by topography...

Site Conditions
The owner and the engineer should visit the proposed site during the initial planning phase and periodically throughout design to identify site conditions and constraints. A survey of...

Preliminary Geotechnical Considerations
In the planning phase of the project, a preliminary geotechnical investigation should be performed to identify the general subsurface conditions and any special subsurface conditions....

Detailed Site Investigations
This section addresses site investigation issues that are important for detailed design and construction of microtunneling projects. These site investigations include the following: Geotechnical...

Microtunneling Design Elements
The design elements and the process for a microtunneling project are generally the same as for other underground projects. Design elements include the following: General conditions; Special...

Enhanced Detection and Mapping of Buried Utilities—A Sustainability Perspective
The social and environmental impacts and benefits of projects make up the triple bottom line that represents a modern view of sustainable project development. Rather than considering only...

Design-Build and Public-Private Partnerships: Risk Allocation of Subsurface Conditions
Project Owners, especially in the public sector, are exploring and utilizing alternative project delivery methods, such as design-build (D-B) and public-private partnerships (P3s). Some...

 

 

 

 