Portland, Oregon, Awards Design Contract For 145 mgd Bull Run Filtration Facility

Chicago Transit Authority Awards $1.2-Billion Contract to Revamp Portion of Busy Red Line

LAX Owner Awards Nearly $2-Billion Contract for New Automated People Mover

California�s East Valley Water District Finalizes Design/Build Contract for Sterling Natural Resource Center

Arizona DOT Awards $916-Million Contract For South Mountain Freeway in Phoenix

Quality Assurance/Quality Control
The contract between the purchaser and the supplier shall state the responsibilities of each party and the conditions under which the work will be accepted or rejected....

Microtunneling Equipment
A discussion of microtunneling equipment in the context of the design aspects of a microtunneling project is applicable only to the extent that the engineer must set forth in the contract...

Contract Documents
As with any civil works project, the bid and contract documents prepared by the owner and the engineer should provide the contractor with the necessary information to prepare bids, to...

Field Aspects
As soon as practical after their arrival at the project site, all pipes, fittings, and appurtenances should be thoroughly checked for compliance with the contract documents and accepted...

Microtunneling Operation
The shaft should provide safe working conditions and fully support the ground. Jacking and receiving shaft support system and sizes are typically determined by the contractor. See Chapter...

Submittals
The contractor should submit the items listed in the specifications for review and acceptance by the engineer. The submittals are generally divided into preconstruction and postconstruction...

Shafts/Temporary Structures
Shafts should be of a size to accommodate the equipment and pipe selected and to allow for safe working practices. If the shaft must accommodate the permanent works, it is the contractor's...

Regulations
The contractor should meet federal, state, and local regulations. The contractor is responsible for jobsite safety....

Instrumentation and Monitoring
A detailed plan for monitoring possible ground surface movements caused by the microtunneling operations should be prepared. The plan is typically prepared by the engineer in consultation...

Restoration and Cleanup
The contractor should be responsible for site restoration and keeping the construction site clean, neat, and orderly at all times....

Measurement and Payment
The owner shall establish a bid schedule to obtain pricing for all work associated with the microtunneling installation. This bid schedule provides the bidders the opportunity to establish...

Failure of a Large Circular Excavation
A circular excavation, 117 feet (36 m) in diameter by 90 feet (27 m) deep, was designed by an experienced engineering firm and construction was performed by an experienced contractor....

Good Clients, Good Procurements, and the Importance of Quality Work
This fourth article in the Business of Geotechnics series addresses a number of topics related to engineering and consulting (E&C) firm clients and obtaining work from them. The...

Rhode Island City Awards 20-Year D/B/O Contract to CH2M HILL

Sound Transit Awards Design/Build Contract For Light-Rail Extension in Seattle

 

 

 

 

Return to search