A Study on Time-Space Occupancy Exposure Volume Index for the Residential Streets Interacted by Vehicular and Pedestrian Traffic Streams

City of Duluth Long Term Street Improvement Program-History

Jet Grouting for the 63rd Street Tunnel

Composite T-Panel Slurry Walls Adjacent to the Historic State Street Block

Seismic Retrofit of Fourth Street & Riverside Viaducts with Micropiles

Higher Ground
Thirty floods over the course of a century, capped by three major floods in 1993, finally convinced residents of Pattonsburg, Mo., that it was time to move the entire town to higher ground....

10th Street Detention Basin and Recreation Facility

A New Approach for Programming Congestion Improvements

Considerations in Developing Strategic Arterials

Safety Benefits of Access Spacing

Probabilistic Rating of Safety on Local Streets

Using Permit Parking to Reduce On-Street Parking and Crime

CORSIM - Corridor Traffic Simulation Model

Catchy Culverts
Franklin County, Ohio, installed box culverts in Norman Ditch to prevent flooding of surrounding homes, streets and sewer lines after heavy storms. The design team, given tight deadlines...

Evaluation of a Real-Time Expert System for Surface Street Traffic Management and Control

Shear-wall Retrofit
With the effects of the 1989 Loma Prieta earthquake still lingering and another quake looming sometime in the future, engineers faced with retrofitting the Pacific Gas & Electric...

Santa Ana River Mainstem Project
The Santa Ana River Mainstem Project consists of seven major features including the construction of 550 ft. high earth and rockf ill dam; raising the embankment by 28 feet of Prado Dam,...

Success or Failure: A Tale of Two Projects
Twenty city blocks and a ten year period separated two projects of similar purposes, but with completely different endings. The first one, the Delancey Street Project, took place in 1984...

Honolulu's Street Relief
Engineers faced the daunting prospect of burying a new relief sewer under a busy Honolulu highway with trench-cut methods. The contractor suggested microtunneling, but the coral reef formations...

An Interception by Boston
Engineers in Boston were recently challenged to design a rehabilitation and replacement for sections of the 60-year-old St. James Avenue sewer system. Approximately 20,000 vehicles per...

 

 

 

 

Return to search