Performance of a Stilling Basin with Partially Short Walls
Outlet Repairs Using Cured-in-Place Pipe
Folsom Dam Outlet Works Modifications
Folsom Dam Spillway Stilling Basin Repair
Over the Top Concrete
The 60-year-old Tongue River Dam in southeastern Montana is undergoing extensive dam safety and reservoir enlargement modifications. Major features of the project include a 60,000 cfs...
When the Levee Inflates
Rubber dams�long, flexible tubes, anchored to a concrete base and abutments and inflated with air or water�have been used since the 1950s, but installations have risen as technology has...
Regionalization of Annual Precipitation Maxima in Montana
Risk Management at Wahleach Dam
In a first-of-its-kind application, engineers used risk analysis to make event-driven design decisions to evaluate dam safety improvements at Canada's Wahleach Dam in British...
Rehabilitation of Chickamauga Dam, Lock and Powerhouse to Manage Concrete Growth
Spillway-Powerhouse Interaction at Chickamauga Dam
Morning Glory Spillway Repairs at Kingsley Dam
Wanapum Dam Spillway Overflow Gate
Hydropower: An Industry Driven to Success Through Recognition of Past Failures
Analysis of the Fort Peck Spillway
The PowerWheel Demonstration Project
Rocky Mountain Pumped-Storage Project in Operation Since the Summer of 1995
Case Study: Lesson and Probabilistic Determination on Eroded Earth Spillway Rehabilitation
New Dimension to Spillway Gate Operation for Reducing the Flood Intensity
Air Concentration Measurements in Highly Turbulent Aerated Flow
Validation of a Three-Dimensional Numerical Model Using Field Measurements in a Large Scale River Reach
Return to search