Avoiding Impacts of Collapsed Mines on Railways: A Multidisciplinary Geophysical Detective Approach
The presence of abandoned mine workings can pose a significant risk to the use and development of surface structures above them, including railway lines. Typically, the adverse and often sudden effects...

A Good Cause for a Causeway: How Geotechnology and Project Delivery Restored a Roadway Embankment Crossing a Historically Challenging Soft Ground Site
As part of a Minnesota Department of Transportation (MnDOT) design-build project, a causeway was constructed in 2017 to replace an aging bridge in the southwest metropolitan area of Minneapolis. The causeway...

Redevelopment of Aggregate and Rock Quarries: No Longer Just a Hole in the Ground
Redevelopment of former sand and gravel (aggregate) and rock quarries can be challenging, often requiring developers, quarry operators, planners, and engineers to work in tandem. As urban and suburban...

Claims against Geotechnical Engineers: Getting it Right in the Midst of Uncertainty
Geotechnical engineering is one of engineering's riskiest professions, prone to litigation due to the inherent uncertainty associated with characterizing the subsurface. Site investigations rarely provide...

Remote Sensing: A New Revolution in Geotechnical Engineering
Remote sensing in the form of satellite imagery has become part of our everyday life—from displaying boring locations at a job site to the various mapping apps on our smart phones that help us get there....

Answering the $64,000 Question: Geotechnical Risk in Design-Build Projects
Subsurface risk may well be the aspect of most construction projects that has the greatest potential impact on a project's success or failure. Even when a thorough geotechnical investigation is conducted...

A Light in the Deep: The Future of Offshore Site Investigations
For deep-water energy developments, hazard identification and risk assessments (that is, assessing the probability of occurrence along with the consequences of failure) are more important...

Long-Term Performance Monitoring of a Hillside Retaining Wall
To accommodate expansion of the West Point Treatment Plant in Seattle, WA, a 3,000-ft-long soldier pile, tieback-anchored retaining wall was constructed from May 1991 to May 1992. An oblique...

Achieving Success and Avoiding Failures with Permeable Pavements
This chapter provides experienced-based recommendations on how to achieve success with permeable pavements. This information is based on an informational survey completed by designers,...

Maintenance
While site selection and proper construction are the most critical factors in establishing that permeable pavements function as designed, all must be inspected and maintained to maximize...

Site Conditions
The owner and the engineer should visit the proposed site during the initial planning phase and periodically throughout design to identify site conditions and constraints. A survey of...

Preliminary Geotechnical Considerations
In the planning phase of the project, a preliminary geotechnical investigation should be performed to identify the general subsurface conditions and any special subsurface conditions....

Detailed Site Investigations
This section addresses site investigation issues that are important for detailed design and construction of microtunneling projects. These site investigations include the following: Geotechnical...

Microtunneling Design Elements
The design elements and the process for a microtunneling project are generally the same as for other underground projects. Design elements include the following: General conditions; Special...

Shaft Considerations
Jacking and receiving shaft locations should be selected to minimize the number of shafts and disruptions while not exceeding the practical limits of the drive lengths achievable for a...

Restoration and Cleanup
The contractor should be responsible for site restoration and keeping the construction site clean, neat, and orderly at all times....

The Joint Industry Development of a Recommended Practice for the Site Specific Assessment of Mobile Jackup Units
The mobile self-elevating (drilling) unit, or jack-up, has been central to the exploration and development of offshore oil and gas reserves. In recent years there has been an increased...

Geotechnical Risk Management: The Five Non-Technical Topics that are Crucial for the Successful Practice of Geotechnical Engineering
It is fair to state that the aspects of civil design and construction referred to as geotechnical engineering can be characterized as inherently risky. Geologic processes are complex,...

Measurement of Hydraulic Conductivity of Partially Saturated Soils
Increased interest in protection of the environment has led to a need to be able to predict long-term movement of moisture, and contaminants, in the vicinity of shallow land disposal sites...

Support of Excavation Challenges and Solutions at a Manhattan Excavation Site
This article discusses the challenges and alternate solutions encountered in 2012 during support of excavation operations at a medical center project site in Manhattan, NY. The project...

 

 

 

 