The State of Our Coasts
Reclamation and Breakwater for IKPP Terminal, Indonesia
Seismic Damage Level for Existing and Proposed Anchored Bulkhead Waterfront Structures in the Boston Harbor
Alterations and Additions to Morgan Creek Harbor, Isle of Palms, South Carolina
Rehabilitation and Strengthening of U.G.G. Jetty #3
Interim Pier 400 Landfill Status Report
Mitigation of Liquefaction Hazards to Anchored Sheet Pile Bulkheads
Geotechnical Considerations for the Batiquitos Lagoon Enhancement Project
Protective Fender System, Waterfront Park–Louisville, KY
Developing and Applying Shallow Draft Harbor Entrance Criteria
Poplar Island Restoration Project: Coastal Engineering Aspects
New Small Craft Harbor for the U.S. Coast Guard
Recent Experience—Antifer Cube Units in Breakwater Construction
Design of a Perforated Breakwater
Combination Breakwater and Pier, Naval Station Everett
Ice Expansion
Surge Protection Design for the City and County of San Francisco Water Transmission System
Estimation of Seismically Induced Lateral Deformations for Anchored Sheetpile Bulkheads
Patterns in the Water: Patterns in the Sand?
Numerical Simulation of Wave Effects on a Combined Breakwater and Platform Configuration
Return to search