Wastewater Systems ? A Privatization Perspective
Membrane Separation Processes in Waste Treatment
The Effect of Low Level Alkalinity on Nitrification Rate
Fish Growth and Lethality Versus Dissolved Oxygen
Biogas Utilization for Power Generation
Progress Report of the Task Committee on Radiation in Engineering
Instrumentation Testing-Key to Compliance Achievement
Surge Flow Applied to Overload Flow Treatment Systems
Sewage Plant
The Sacramento Regional Wastewater Management Program cost $460 million, took 10 years to build, and solved problems in sludge disposal, odor control, conveyance systems, combined sewer...
Steady-Site Dispersion of Pollutants in Rivers Near Sewage or Drainage Outfalls
A theoretical model is developed for determination of concentration distribution of pollutants in a river. Pollution is caused by the disposal followed by dispersion of sewage or drainage...
Hydraulic Testing of a Large Make-Up Pipeline
A 37 mile pipeline which consists of sections of 114 inch, 96 inch and 66 inch pipes was constructed for delivering secondary sewage effluents for power plant makeup. During initial operations,...
EPA Sets Stricter Regs for Building Sewage Plants
GAO Calls for Better Guidance for Sewage Plant Inspectors
Aquaculture Theory and Practice: Hercules, California
Factors Affecting Nitrogen Removal in Water Hyacinth Treatment Systems
Nitrogen Removal in Single-Stage Activated Sludge
Control of Activated Sludge Settling in an SBR
Wastewater Biofilms: Their Formation and Ultrastructural Characteristics
Kinetics of the Rotating Biological Contactor
Fixed-Film Anaerobic Digestion
Return to search