Seismic Vulnerability Assessment of Seattle Water Department's Water System Facilities
The Seattle Water Department (SWD) service area and watersheds lie in seismic zone 3, in which there is potential for major earthquakes (Richter magnitude 7.5 or greater). The SWD system...

Earthquake Loss Estimation Modeling of the Seattle Water System Using a Deterministic Approach
This paper summarizes the project and resulting report entitled Earthquake Loss Estimation Modeling of the Seattle Water System (Ballantyne, 1990) conducted under funding from the United...

Seismic Vulnerability Analysis and Upgrade of Seattle Metro Wastewater Facilities
The Municipality of Metropolitan Seattle, Metro, provides wholesale wastewater transport and treatment for 30 cities and sewer districts. A Seismic Vulnerability Assessment Worksheet for...

Seattle's Good Neighbor Policy
The West Point wastewater treatment plant in Seattle sits on a spit of land jutting into Puget Sound. Close by is Discovery Park, a haven for nature lovers, located on a bluff above the...

Investigation & Rehabilitation of Seattle's Tolt Pipeline
Seattle Water Department's Tolt Pipeline brings water 24 miles from storage in the Cascade Mountains into city and suburban distribution systems. Twenty-three miles of this...

Validation of a Traffic Modeling System for Detour Planning
The Downtown Seattle Transit Project (DSTP) was initiated as an effort to relieve existing traffic congestion in downtown Seattle. It consists primarily of a 1.3-mile electric-bus tunnel...

Subway Design and Construction for the Downtown Seattle Transit Project

Design, Construction and Performance of a Soil Nailed Wall in Seattle, Washington

Seattle Swing
The swing bridge has long been out of favor in the U.S. because of the navigational hazard presented by mid-channel pivot piers. A consortium of engineers is updating the design to a state-of-the-art...

Seattle Rehab Project (1988-89) Seattle Metro

Seattle Cleanup Largest in State

Metro Project Implementation?The Early Stages
Metro (the Municipality of Metropolitan Seattle) is a federation of governments in King County, Washington which is responsible for regional public transportation and waste water collection...

Cedar Falls Project-Rehabilitation with RCC
This paper presents an overview of the planning, design, and construction considerations used during the development of the 9. 1 m (30-foot-high) Cedar Falls Roller Compacted Concrete...

Cedar Falls Project?Major Rehabilitation
This paper presents planning objectives and operational considerations which governed the design and construction of a major rehabilitation project implemented at the City of Seattle's...

Single Conduit Dam Design
In today's arena of increasingly higher costs for major dams, planners and designers are continuing to look into ways of reducing the overall costs for the development of...

Expert Systems for Drought Management: A Case Study
This paper describes the development and application of a computer model used by the Seattle Water Department (SWD) for operations during drought. This model provides guidance for initiating...

The Development of Metropolitan Water Markets: Seattle, Washington 1887-1987
This paper applies the case-study approach to examine the development of metropolitan water markets and its implications for central city and suburban water districts. The greater Seattle,...

Design Features of the Elliott Bay Marina
The paper presents a summary of the major coastal engineering design features of a new Puget Sound small craft harbor proposed for construction within the City of Seattle. The 1,200 berth...

Application of a Management Strategy for Dredging and Disposal of Contaminated Sediments to Proposed U.S. Navy Homeport Project at East Waterway, Everett Harbor, Washington
The U. S. Navy proposed to homeport a Carrier Battle Group, and requested technical assistance from the Seattle District, U. S. Army Corps of Engineers, to evaluate dredging and disposal...

A Benthic Environmental Evaluation Protocol for a New Municipal Marine Outfall
Concurrent with siting studies to relocate a 72 mgd secondary outfall diffuser in deep water (200 meters), the Municipality of Metropolitan Seattle initiated a three year baseline study...

 

 

 

 