Characterization Uncertainty and its Effects on Models and Performance
Geostatistical simulation is being used to develop multiple geologic models of rock properties at the proposed Yucca Mountain repository site. Because each replicate model contains the...

Emplacement Drift Temperature Reduction by Cooling Enhancement and Ventilation
The application of cooling enhancement in a short vertical container emplacement layout is analyzed. Two 25 m-long heat pipes upward oriented at 45 degrees are installed at each emplacement...

The Constructive Use of Heat in an Unsaturated Tuff Repository
By designing the engineered barrier system in an unsaturated tuff repository to constructively use heat, the waste containers can be kept dry for hundreds of years. Without water, the...

Recent Development in the Design of Hard Rock Tunnel Boring Machines for the Mining Industry
Underground development for nuclear waste storage will possibly require tunnels to be excavated in a variety of rock conditions and configurations. Recent innovations in Tunnel Boring...

Shaft Boring Machine?A Method of Mechanized Vertical Shaft Excavation
The Shaft Boring Machine (SBM) is a vertical application of proven rock boring technology. The machine applies a rotating cutter wheel with disk cutters for shaft excavation. The wheel...

Design, Selection, and Application of Disc Cutters in Hard and Abrasive Rock
Disc cutters have been used on tunnel boring and shaft boring machines for many years and are a proven method to bore hard rock. This paper will study the important parameters which effect...

The Application of Computerized Tomography for Determining Material Properties
X-ray computerized tomography (CT) is an imaging technique that has been used by the medical community for a number of years and is well documented. However, the adaption of this technique...

Models for Rock Mass Dynamics
The phenomenology of explosive effects in hard rocks is of interest to workers in the energy field, in the defense field, and in planetary science. The salient characteristic of hard rock...

The Pressuremeter: Some Special Applications
The preboring pressuremeter has been used for foundation design for many years. Some recent developments are presented which extend the applications of the pressuremeter. These developments...

Plate Load and Pressuremeter Testing in Saprolite
On the island of Oahu, Hawaii, an exploratory tunnel for the Interstate Route H-3 highway was completed in December 1989. The purpose of the exploratory tunnel was two-fold; first to locate...

Use of Computers for Soil and Rock Testing
The Bureau of Reclamation's central geotechnical laboratory in Denver, Colorado, routinely uses computers and associated electronic measurement devices for data acquisition,...

Reliability in Rock Engineering
This paper reviews approaches to reliability in rock engineering through a survey of methods developed at MIT. Since these methods are intended to be applied in engineering decisions,...

Methodology for Optimizing Rock Slope Preventative Maintenance Programs
Rock slopes along transportation routes can fail in several different modes, with various types and magnitudes of consequences. The 'risks' associated with such...

Use of a Tie-Back Retaining Wall to Stabilize a Moving Landslide
After failure of a gravity retaining wall, a moving landslide was stopped and stabilized by a tie-back retaining wall. The design considered the active landslide and residual strength...

Numerical Modelling of Lower Lias Rock Failures in the Coastal Cliffs of South Wales
A model has been developed to evaluate slope failure in the interbedded limestone and mudstone Lower Lias series which outcrop for some 30 km in coastal South Wales. Computer simulation...

B.C. Hydro's Practice for Assessing the Foundations of Existing Dams on Rock
Since the early 1980's B.C. Hydro has carried out dam safety reviews which included 33 gravity and embankment dams founded on rock. The foundations include moderately jointed,...

Geotechnical Aspects of the Underground Excavations at the Kemano Completion Project
The Kemano Completion Project is the addition of four generators of 540 MW installed capacity to an existing eight-unit underground hydroelectric generating station owned and operated...

Innovative Design for Diversion
A conventional diversion scheme to facilitate construction of the 120 m high rockfill dam for the Beni Haroun project in Algeria would have required three 10 m diameter diversion tunnels....

Stability Analysis of Gravity Dam Foundations with Horizontal Seams
Determination of the overall factor of safety against sliding is an important aspect in concrete dam design. Limit equilibrium methods have serious limitations. A method for determining...

Through-Flow Analysis for Rockfill Dam Stability Evaluations
Existing rockfill dams may have spillways that are not adequate to pass the current probable maximum flood (PMF), having been designed prior to the publication of the latest Hydrometeorological...

 

 

 

 

Return to search