Beach Replenishment for Amtrak's Niantic River Bridge Replacement

Geotextile Tube: The Other Soil Reinforcement

Citizen Engineer: A Handbook for Socially Responsible Engineering by David Douglas and Greg Papadopulous, with John Boutelle. Upper Saddle River, New Jersey: Prentice Hall, 2010.

A Design Theory for Compaction Grouting
(Originally published in Grouting, Soil Improvement, and Geosynthetics (Geotechnical Special Publication No. 30), 1992, 215-228.)...

Estimating Slope Stability Reduction due to Rain Infiltration Mounding
(Originally published in J. of Geotechnical and Geoenvironmental Engineering 2006, 132(9), 1219-1228.)...

Rebuilding the Route Interchange: Ground Improvement on the Woodrow Wilson Bridge Project
Error should be: Rebuilding the Route 1 Interchange: Ground Improvement on the Woodrow Wilson Bridge Project...

Erratum for Rebuilding the Route Interchange: Ground Improvement on the Woodrow Wilson Bridge Project

Permits, Surface Water/Groundwater Baseline Sampling, and Analysis of Dewey-Burdock In Situ Uranium Project in Fall River County, South Dakota
Powertech Uranium Corporation has proposed to conduct in situ mining within a uranium enriched ore deposit on the proposed permit area known as the Dewey-Burdock project. The project is...

Advances in Watershed Management and Fluvial Hazard Mitigation Using Artificial Neural Networks and Remote Sensing
Watershed and channel management across spatial and temporal scales requires an informed, interdisciplinary approach by experts and stakeholders, who often have disparate goals and objectives....

Flood Warning System for the Sutlej River in Remote Northern India
Through a collaborative effort of the Central Water Commission (CWC) of India, the U.S. Agency for International Development (which provided funding for the project), Riverside Technology,...

Floodplain Delineation of the Ranillas Meander in Zaragoza Using GUAD-2D
After the selection of Zaragoza (Spain) as the host city of the International Expo 2008, the Gobierno de Aragón (i.e., the local government)...

Evaluation of Geopier Rammed Aggregate Piers by Geopier Foundation Company
Final Report
Prepared by the Highway Innovative Technology Evaluation Center (HITEC). This report describes a HITEC evaluation designed to determine the basic capabilities...

Stability of Offshore Gravity Structures Foundations by the Upper Bound Method

Geo-Denver 2007
New Peaks in Geotechnics
Proceedings of Geo-Denver 2007, New Peaks in Geotechnics, held in Denver, Colorado, February 18-21, 2007. Sponsored by the Geo-Institute of ASCE. This collection contains nearly 300 papers...

Offshore Technology in Civil Engineering
Hall of Fame Papers from the Early Years: Volume Two
Prepared by the Program Committee, Offshore Technology Conference, of the Coasts, Oceans, Ports, and Rivers Institute of ASCE. This series presents...

History of the USDA-ARS Experimental Watersheds on the Washita River, Oklahoma
A national experimental watershed network, operated by the Agricultural Research Service of the US Department of Agriculture, was established in 1959 to conduct research on the effects...

Ethical and Professional Issues Associated with River Restoration
As river and ecosystem restoration becomes increasingly more common, more professional concerns are arising including licensure, professional responsibility, ethical behavior, competency,...

Geo-Frontiers 2005
These Proceedings showcase recent advancements in all facets of the geo-industry. Geo-Frontiers was conceived to present the frontier of civil, geotechnical, and geoenvironmental engineering....

Evaluation of the VERSA-LOK / Miragrid Reinforced Soil Wall System
Final Report
Prepared by the Highway Innovative Technology Evaluaton Center (HITEC), a service center of Civil Engineering Research Foundation. This evaluation...

Estimating Streamflow throughout River Networks using Hierarchical Artificial Neural Networks for Determining Fluvial Impairment in Watersheds

 

 

 

 

Return to search