San Diego Looks to Indirect Potable Reuse to Address Water Needs, Fix Waiver Issue
Project Layout
Microtunneling projects should be laid out with attention to the benefits and constraints unique to this construction process. The following recommendations address some of these concerns:...
Microtunneling Operation
The shaft should provide safe working conditions and fully support the ground. Jacking and receiving shaft support system and sizes are typically determined by the contractor. See Chapter...
Submittals
The contractor should submit the items listed in the specifications for review and acceptance by the engineer. The submittals are generally divided into preconstruction and postconstruction...
Shafts/Temporary Structures
Shafts should be of a size to accommodate the equipment and pipe selected and to allow for safe working practices. If the shaft must accommodate the permanent works, it is the contractor's...
Construction Support Services
A preconstruction survey of existing structures within the anticipated construction zone of influence should be conducted before any construction begins. A plan for structures that need...
Regulations
The contractor should meet federal, state, and local regulations. The contractor is responsible for jobsite safety....
Instrumentation and Monitoring
A detailed plan for monitoring possible ground surface movements caused by the microtunneling operations should be prepared. The plan is typically prepared by the engineer in consultation...
Restoration and Cleanup
The contractor should be responsible for site restoration and keeping the construction site clean, neat, and orderly at all times....
Measurement and Payment
The owner shall establish a bid schedule to obtain pricing for all work associated with the microtunneling installation. This bid schedule provides the bidders the opportunity to establish...
Conduct of Operational Hail Suppression Projects
Those conducting hail suppression operations should be vigilant and always prepared to react when potential hailstorms begin to develop. In this chapter, some guidance is provided for...
Small Projects are Big Deals
Geotechnical engineers work on a wide array of projects, ranging from small retaining walls or pavement projects, to construction of dams, canals, and foundations for bridges and high-rise...
The Leaning Towers of Wilmington, Delaware: Emergency Response and Retrofit of the I-495 Viaduct to Address Lateral Squeeze
On a sunny, summer afternoon last June, the project manager for AECOM's open-end bridge design contract with the Delaware Department of Transportation (DelDOT) received an...
Geotechnical Risk Management: The Five Non-Technical Topics that are Crucial for the Successful Practice of Geotechnical Engineering
It is fair to state that the aspects of civil design and construction referred to as geotechnical engineering can be characterized as inherently risky. Geologic processes are complex,...
Making Big Data Work for You and Your Project: A 3-D Geotechnical Model is a Smart Way to Work
Modeling the stratigraphy beneath a site and assigning soil and rock properties are important steps in geotechnical engineering. Geotechnical engineers often need to model ground conditions...
Journal of Sustainable Water in the Built Environment
The Journal of Sustainable Water in the Built Environment presents activity and research developments in water issues, challenges, and opportunities throughout the developed landscape. The scope covers...
Managing Geotechnical Assets to Improve Highway System Performance
As geoprofessionals, we have a great opportunity to look at our work in new ways and to show its value to others. Highway agencies are looking to get the most from their assets and with...
Condition Indices, Performance Measures, and Managing Performance Data for Geotechnical Asset Management – Don't Get Buried!
Why don't transportation agency assets like pavements, bridges, and earthwork have a Check Engine light? Why can't you simply pull up the complete history and life cycle plan for them?...
Asset Management of Earth Retaining Structures: Design through Design Life
Regarding new earth retaining structures (ERS) construction, the message is clear: plan for asset management. New construction is certainly not immune to performance issues, and the time...