Three-Dimensional, Hydrostatic and Non-Hydrostatic Modeling of Seiching in a Rectangular Basin

Potential Effects of San Mining and Debris Basins on Coastal Sediment Supply in Los Angeles County
The potential sediment supply to the coast in Los Angeles has been heavily impacted by human activity. In the context of rational management of beaches as a resource, it is fundamental...

The New Orleans Network
Though Seattle and Portland are the cities usually associated with high rainfall, the New Orleans metropolitan area averages 58 in. (1,473 mm) of rainfall each year—more than any other...

Frequency of the 1993 Flood in the Upper Mississippi River Basin

Bridge Scour During the 1993 Floods in the Upper Mississippi River Basin

Damage to Highway Infrastructure 1993 Mississippi River Basin Flooding

Bridge Scour During the 1993 Floods in the Upper Mississippi River Basin

Magnitude and Frequency of the 1993 Flood in the Upper Mississippi River Basin

Stormwater Pond Perceptions Vs. Realities: A Case Study

An Urban River Renewed — Denver's South Platte River

Stormwater Management in Birkeland Basin, Bergen — Sixteen Years Research and Experiences

Development of Baseline Water Quality Stormwater Detention Pond Model for Chesapeake Bay Catchments

Management of Hydrographic Basins: Considerations in Application of the Network Method

Resolving the Water Wars: The Compacts Between Alabama, Florida, and Georgia
(No paper) Several water supply proposals on behalf of Georgia have caused a water rights ?war? which pits Alabama and Florida against Georgia in the Apalachicola, Chattahoochee, and Flint...

Estimation of Peak Flood Discharge for Halilrood Basin, Iran
The peak flood discharge from catchments is one of important information needed for the planning of the water resources projects. In many cases long term data of annual runoff are not...

Basin Response Time: Potential Hydrologic Basin Handprint
Hydrologic lead time is an important factor in many water resources engineering applications. The determination of the response time of a watershed to runoff-producing rainfall is the...

A Decision Support System for Assisting Operation of Artificial Recharge Systems
A series of simulation and optimization models analyzing artificial recharge systems have been linked within a decision support system (DSS) with a graphical interface. The model includes...

A GIS-Based Interactive Decision Making Tool for Watershed Management
(No paper) BASINS—Better Assessment Science Integrating Point and Nonpoint Sources, a geographical information system- (GIS-) based tool developed and released by the US EPA, provides...

A Leadtime Driven Flood Warning Response Plan Design
(No paper) The paper examines the optimal combination of predictive and detective capabilities in the development of the Wickenburg Flood Response Plan and extrapolates those findings...

Interactive Flood Response Plans: Internet/Intranet Formats with National Implications
(No paper) An effective flood response plan takes into account the needs of and utility to the end user of that plan—namely the local emergency response community. A flood response plan...

 

 

 

 

Return to search