Role of Surge and Possible Mitigation in PCCP Design
TRWD Experience with Prestressed Concrete Pipe
Evaluation of Prestressed Concrete Cylinder Pipe in a High Chloride Environment After 19 Years of Service
Effects of Environment on the Durability of Prestressed Concrete Cylinder Pipe
Rehabilitation of 183 cm PCCP with Steel Plate Liners
Overcoming the Challenges of Replacing 20 km of Defective 1524 mm Diameter PCCP
PCCP Design Check Using C304-92 in a Spreadsheet
Assuring Top Quality Prestressing Wire in PCCP
Advancements in Design and Installation of Prestressed Concrete Cylinder Pipe
Condition Assessment and Repair of Prestressed Concrete Pipeline
In-Line Electromagnetic Inspection of PCCP
Internal Inspection and Database Development of PCCP
Sources of Funding for Replacement and/or Repair of Defective PCCP
Practical Repair Procedures for Concrete Pressure Pipe
Precast Prestressed Slurry Wall for Pilot House Project
Pipelines in the Constructed Environment
This proceedings,
Design of New Wharf Expansion for the Port of Port Arthur, Texas
Underwater Cracking of Prestressed Concrete Piles
Structural Damages Caused by Hidden Overloads in a Reinforced and Prestressed Concrete Parking Garage: Diagnosis and Repair Procedures
Steel Post-Tensioning Tendon Behavior: Up to 35-Year Marine Exposure
Return to search