Compression Tests of Double Angles with Variable Stitch Bolt Spacing
New Design of 25 kV Pinned Base Lattice Structures for Substations
Transmission Line Tower Design Optimization
Seismic Response Modification Factors for Lattice Steel Electrical Transmission Towers
Extending Life and Adding Control -- The Rehabilitation of a 70 Year Old Water Transmission Main
Fiber Optic Strain Monitoring Inside a Power Plant Boiler
Hydro System Modeling for Real Time Simulation
Impacts of In-Stream Flow Requirements Upon Water Temperature in the Central Platte River
An Analysis of Platte River Channel Changes
Control of Nuisance Algae Growth in Hydropower Distribution Systems
El Dorado Hydroelectric Project - Penstock Relining Case Study
Madison Penstock Rehabilitation
EPC Expansion at Thompson Falls Hydroelectric Project
Post Construction Site Rehabilitation Cleaning Up the Mess
Planning Processes of Resettlement in China: Two Case Studies in Sichuan and Hebei Provinces
Responding to Aesthetic Values at Shoshone Falls
When the Property is the Project: Integrating the Federal Power Act with the Requirements of the National Historic Preservation Act at the Federal Energy Regulatory Commission
A New Zealand Owner's Policy on Testing Hydraulic Structure Gates and Valves
Updates to the Federal Energy Regulatory Commission's Engineering Guidelines
Rehabilitation of Chickamauga Dam, Lock and Powerhouse to Manage Concrete Growth
Return to search