TRWD Experience with Prestressed Concrete Pipe

Evaluation of Prestressed Concrete Cylinder Pipe in a High Chloride Environment After 19 Years of Service

Effects of Environment on the Durability of Prestressed Concrete Cylinder Pipe

Overcoming the Challenges of Replacing 20 km of Defective 1524 mm Diameter PCCP

Design and Construction Aspects of the PCCP Water Main Rehabilitation

The Lake Gaston Pipeline: 76 Miles of Controversy

Design and Construction of the Valley Center Pipeline

Designing and Building a Major Transmission Main through a Constructed Environment, The North County Distribution Pipeline

PCCP Design Check Using C304-92 in a Spreadsheet

Assuring Top Quality Prestressing Wire in PCCP

Advancements in Design and Installation of Prestressed Concrete Cylinder Pipe

Practical Repair Procedures for Concrete Pressure Pipe

Lessons Learned about Cured-in-Place Pipe During Construction

Pipeline Market—20 Billion Dollars for 1998: Would You Like Some of This Work?

Pipeline Drainage Discharge Analysis

Design and Construction of the Sweetwater Reservoir Urban Runoff Diversion System 48-Inch Pipeline

Cliffside Correction
Construction of a 10 km sewer collector in Valparaíso, Chile, came to a halt due to construction difficulties experienced during pipe jacking operations. Analysis revealed not only construction...

Laboratory Pipe Box Testing to Simulate Toe Drain Performance

Do Coated Pipes Last Longer?
Field studies have revealed that polymer coated steel pipe resists corrosion longer than pipe coated with other materials. Corrosion is the most common failure mechanism of pipe culvert,...

Pipeline Route Selection for Rural and Cross-Country Pipelines
Prepared by the Task Committee to Rewrite Manual of Practice 46 of Committee on Pipeline Installation and Location of the Pipeline Division of ASCE ...

 

 

 

 

Return to search