Delegate, Network, and Ask for What You Want
Justin Siegrist, P.E., M.ASCE, is the hydraulic modeling lead in the Cincinnati office of Wade Trim. His advice to young engineers: delegate, network, and ask for what you want....

Design of Submarine Pipelines Against Upheaval Buckling
This paper describes part of a comprehensive joint-industry project on upheaval buckling. It develops a semi-empirical simplified design method and detailed design methods based on a new numerical analysis,...

Scope
This standard guideline covers planning, design, pipe materials, and construction of microtunneling. The term microtunneling is defined as a trenchless construction method for installing...

Project Layout
Microtunneling projects should be laid out with attention to the benefits and constraints unique to this construction process. The following recommendations address some of these concerns:...

Shaft Considerations
Jacking and receiving shaft locations should be selected to minimize the number of shafts and disruptions while not exceeding the practical limits of the drive lengths achievable for a...

Pipe Characteristics
Microtunneling pipe should meet the following general requirements: Circular shape with a flush outside surface (including at the joints); Strength sufficient to withstand both the installation...

Pipe Design
The pipes and joints, once installed, must be capable of safely withstanding, for the project design life, all in-use service loads, including those associated with the following factors:...

Field Aspects
As soon as practical after their arrival at the project site, all pipes, fittings, and appurtenances should be thoroughly checked for compliance with the contract documents and accepted...

Shafts/Temporary Structures
Shafts should be of a size to accommodate the equipment and pipe selected and to allow for safe working practices. If the shaft must accommodate the permanent works, it is the contractor's...

Performance Limits for Deepwater Pipelines
This paper highlights the differences between onshore and offshore pipeline design. It then summarizes the results of combined external pressure, tension, and bending testing on full scale...

Axial Load Capacity of Pipe Piles in Sands
The axial load capacity of driven, open-ended, steel pipe piles in cohesionless soils, is often estimated using a method such as the American Petroleum Institute Recommended Practice 2A...

Behaviour of Open-Ended Pipe Piles in Sand During Installation and Loading
An experimental study was performed to investigate the physical processes which influence the axial load capacities of open-ended steel pipe piles in sand. A double-walled pipe pile was...

Axial Capacity of Steel Pipe Piles in Clay
Development of theories for the prediction of the axial compressive and tensile load capacities of driven piles is made difficult by a variety of factors, e.g., disturbance of the soil...

Design and Installation of Auger Steel Catenary Risers
The Auger export pipelines are connected to the TLP by steel catenary risers (SCRs). This is believed to be the first time steel pipe has been used for catenary risers. SCRs offer advantages...

Enhanced Detection and Mapping of Buried Utilities�A Sustainability Perspective
The social and environmental impacts and benefits of projects make up the triple bottom line that represents a modern view of sustainable project development. Rather than considering only...

Sinkhole Investigation and Grouting: Novel Recommendations for a Pipeline Right-of-Way
In 2009, numerous sinkholes developed within and adjacent to a 400-ft-long section of high-pressure, petroleum pipeline right-of-way that crosses under a local creek in Plymouth Meeting,...

Existing Sewer Evaluation and Rehabilitation
Fully revised and updated, this authoritative volume offers the most comprehensive information available on maintenance, repair, rehabilitation, and replacement of existing sewers. This...

Cleaning and Inspection
This chapter discusses the cleaning and inspection of culverts and storm sewers....

Evaluation and Condition Assessment
To determine whether a culvert or storm sewer needs to be renewed, an inspection needs to be conducted and the findings recorded. The first step in such a program is to establish a standard...

Discussion of Time for Development of Internal Erosion and Piping in Embankment Dams by Robin Fell, Chi Fai Wan, John Cyganiewicz, and Mark Foster
(Originally published in J. of Geotechnical and Geoenvironmental Engineering, 2004, 130(9), 980-981.)...

 

 

 

 

Return to search