Microtunneling Design Elements
The design elements and the process for a microtunneling project are generally the same as for other underground projects. Design elements include the following: General conditions; Special...

Permits, Surface Water/Groundwater Baseline Sampling, and Analysis of Dewey-Burdock In Situ Uranium Project in Fall River County, South Dakota
Powertech Uranium Corporation has proposed to conduct in situ mining within a uranium enriched ore deposit on the proposed permit area known as the Dewey-Burdock project. The project is...

Cumulative Hydrologic Impact Assessment of West Virginia Coal Mine Permits Using HSPF and WCMS

Riparian Water Regulations
Guidelines for Withdrawal Limitations and Permit Trading
Sponsored by the Environmental and Water Resources Institute of ASCE. This report explains how to regulate the routine withdrawal of water efficiently...

A Guide for Best Management Practice (BMP) Selection in Urban Developed Areas
With the ongoing NPDES Stormwater Permits, TMDL programs, and the increase in environmental awareness, many municipalities are challenged to address the relatively new concept of cleaning...

Implementation of the Phase II Stormwater NPDES Permits
In the 1987 amendments to the Clean Water Act, Congress directed the United States Environmental Protection Agency (EPA) to establish a permitting framework under the National Pollutant...

Streamlining the Permit Approval Process for the Installation of Scour Countermeasures at Bridges

Load Rating and Permit Review Using Load and Resistance Factor Philosophy

Reclaimed Wastewater Reuse in Arizona: Status and Vision for the 21st Century
(No paper) The Arizona Department of Environmental Quality (ADEQ) regulates the reuse of reclaimed wastewater through the issuance of individual reuse permits to treatment plants and/or...

The Spatial Reconfiguration of the Portland Metropolitan Area: A Baseline Measurement and Preliminary Assessment

Storm Water Permitting in the Milwaukee River Basin

Development of an Integrated Toxic Loading Permit Model for both Municipal and Industrial Applications

National Onsite Wastewater Treatment: A National Small Flows Clearinghouse Summary of Onsite Systems in the United States, 1993

Permit Streamlining Efforts in Alaska

Surface Water Monitoring Under the Country's Largest Municipal Stormwater Permit

Platform Decommissioning: Chevron's Experience with the 4H State Platforms Abandonment Project Santa Barbara Channel, California

Offshore Facility Decommissioning: Issues and Opportunities

After the Permit: Resolving Conflicts Between OCS Developement and Local Land Uses and Resources

Carlsbad Opportunistic Beach Fill Program

Up and Running: Final Design and Startup of the Terminal 5 Expansion at the Port of Seattle

 

 

 

 

Return to search