Microtunneling Equipment
A discussion of microtunneling equipment in the context of the design aspects of a microtunneling project is applicable only to the extent that the engineer must set forth in the contract...

Evaluation of IA SWAT Testing Protocol for ET Controllers
In recent years the Irrigation Association (IA) has developed a testing protocol for Smart Water Application Technologies (SWAT). These technologies consist of irrigation controllers such...

Pipeline Route Selection for Rural and Cross-Country Pipelines
Prepared by the Task Committee to Rewrite Manual of Practice 46 of Committee on Pipeline Installation and Location of the Pipeline Division of ASCE ...

Practice Periodical of Hazardous, Toxic, and Radioactive Waste Management
The Practice Periodical of Hazardous, Toxic, and Radioactive Waste Management publishes articles relating to the allied engineering and scientific disciplines involved in the environmental aspects of the...

Session: Project Peer Review, Special Structural Inspection, Electronic Communication: Roundtable Discussion and Paper Presentation

Special Inspection, Structural Observation and Structural Peer Review in California

Common Industry Peer Groups

27 Years Documenting Engineering Heritage

Project Structural Peer Review in Massachusetts

Standard Contracts for Project Peer Review and Special Inspection Services

Special Inspections and Project Peer Review in Connecticut

Airports and Air Quality Issues - the European Perspective
This paper presents a detailed review of air quality studies at European Airports since 1986. It also provides a brief analysis of the air quality section of a recent ACI (Europe) environmental...

Nuclear Regulatory Commission Staff Approaches to Improving the Integration of Regulatory Guidance Documents and Prelicensing Reviews

When and How Can You Specify a Probability Distribution When You Don't Know Much?
This paper presents an excerpt from the proceedings of the above-named workshop, and gives an overview of both the workshop and the proceedings. Five papers with diverse and complementary...

Revised Hydraulic Design of the Rio Hondo Flood Control Channel
The US Army Engineer District, Los Angeles has completed a major review study of the Los Angeles County Drainage Area (US Army, 1992) and has determined that the existing flood control...

Estuarine and Coastal Modeling
This volume contains the proceedings of the 3rd International Conference on Estuarine and Coastal Modeling held in Oak Brook, Illinois, September 8-10, 1993. The conference included sessions...

Glossary of the mapping sciences
The Glossary of Mapping Sciences, a joint publication of the American Congress on Surveying and Mapping (ACSM), American Society for Photogrammetry...

Qualification of Existing Data for the Yucca Mountain Site Characterization Project
The U.S. Department of Energy (DOE) has completed its first effort to qualify existing data using NUREG-1298 'Qualification of Existing Data for High-Level Nuclear Waste Repositories'....

NOAA's Damage Assessment Program: Past, Present, and Future
This paper reviews trustee authorities established under the Super fund Act of 1980 and the Oil Pollution Act of 1990 to provide an introductory framework for more detailed presentations...

An Example of Rubble Mound Construction Procedures
The Gold Coast of Queensland, Australia, is in an exposed coastal zone that is now suffering from major problems with both the availability of suitable large rubble armour and its durability...

 

 

 

 

Return to search