New Cruise Terminal for San Francisco
A new international Cruise Terminal is being developed at Pier 30-32 in San Francisco, to replace present inadequate facilities at Pier 35. The Cruise Terminal will be developed as part...
Vacuum Alumina Unloader for Port of Everett
The Port of Everett is in the process of rebuilding and expanding its marine cargo facilities. Much of the Port's waterfront land and facilities were lost to the U.S. Navy Carrier Homeport...
Seismic Survey Considerations in the Planning and Design of Dredging Projects for Marine Terminal Facilities
This paper presents a case study of the value of high resolution seismic survey information when planning and designing a dredging project for a marine terminal facility. Advances in high...
A Removable Submarine Cover for Drydock No. 2 Modernization
In order to provide balanced overhaul capability and flexibility in the 1990's and beyond, the Portsmouth Naval Shipyard in Kittery Maine, a major U.S. Navy submarine and overhaul repair...
Underground Refrigeration Outlets
This paper discusses facilities for underground refrigeration at terminal at Port of Tacoma, to provide services to Evergreen line, the worlds largest container shipping company....
Evaluation of Proposed Port Facilities, Charleston Harbor, South Carolina
Often it is necessary for port facility designers to evaluate various alternative development plans for port facilities. These evaluations may include a ship navigability study or an evaluation...
Draft Chapter 3—Planning and Design Guidelines for Small Craft Harbors—Inner Harbor Structures
The purpose of this paper is to present, in draft form, the third chapter of a technical report on the planning and design of small craft harbors being prepared by a special task force...
Control of Contaminant Transport in Estuaries
This paper describes the development of a computational procedure for the adaptive control of hazardous releases in a vertically-mixed estuary. In particular, the control strategy is aimed...
FM—An Educated, Integrated Approach
Alternative Study for the Breakwater and Fishing Pier Rehabilitation at Playland Park, Rye, New York
An alternative study was conducted to determine that existing condition of a deteriorated timber pier and a rubblemound breakwater, and to develop alternative rehabilitation plans leading...
Composites for Offshore Applications: A Multidisciplinary Education Program for the Marine Industry
Composites are increasingly being considered for offshore and other marine structural applications. Polymeric matrix composites reinforced with glass, carbon, and aramids offer substantial...
Upgrading Today's Terminals for Tomorrow's Needs
This paper describes how a 1940's vintage, timber pile supported wharf is being modernized to serve post-Panamax ships: how the Massachusetts Port Authority (MASSPORT) is rebuilding their...
An Event Size Probability Distribution for Risk Analysis
Retrofitting Storm Water Facilities for Quantity and Quality Control
Historically, urban storm water detention facilities in the U.S. were first designed, constructed and operated for the single purpose of urban flood control. In the second phase, recreation...
Container Terminal Planning: 2001
This paper highlights the technical, yet practical planning process and operations research methodologies used by the country's largest containership company to guide 21st Century container...
Wind Power in Antarctica—Case Histories of the North Wind HR3 Wind Turbine
The combination of extreme weather conditons and remoteness of the Antarctic sites makes them even better suited for wind turbine installations since the alternative power sources are...
Interim Spent-Fuel Storage Options at Commercial Nuclear Power Plants
Although spent fuel can be stored safely in waterfilled pools at reactor sites, some utilities may not possess sufficient space for life-of-plant storage capability. In-pool storage capability...
The Changing Legal Structure of Non-Utility Generation in the 1990's
Before actual construction of a small power production or cogeneration facility commences, numerous economic, technical and legal factors have been considered during the planning process....
Design Considerations for the Yucca Mountain Project Site Characterization
The Site Characterization Facilities (SCF) to be located in volcanic tuff at Yucca Mountain is a challenge to manage, design, and construct. This challenge is a result of a number of factors....
State Environmental Review of a Proposed Utility Independent Spent Fuel Storage Installation
This paper describes the environmental review process which was applied by the State of Minnesota to a proposed dry cask storage facility. An environmental analysis of the proposed project...