How General Consultants can Provide Owners with Improved Performance and Reduced Risks and Liabilities Through Better Specifications and Inspection

Construction Risks and Liability Sharing
Extensive litigation, large claims, construction conflicts and long delays have been increasing at an alarming rate during the past decade the trend is unmistakable and the dollar magnitude,...

Controlling Tunnel-Lining Costs—Tips for Owners and Designers
Emphasis is placed on those aspects of design likely to lead to cost savings or the avoidance of unanticipated extra cost during construction. Tunnel lining design requires knowledge about...

Payment Provisions for Shotcrete as Seen by the Owner

Payment Provision as Seen by the Owner

The Agency, The Owner, and the Engineer, in Texas

One Owners Dam Safety Program and Its Application Under Government Regulation

Use of Shotcrete from the Standpoint of the Owner

An Owner's Program for the Investigation and Analysis of its Dams

Owners Comments

Owner-Engineer-Contractor Economic Considerations in Dam Construction

Owner — Engineer — Contractor Economic Considerations in Dam Construction

Owner — Engineer — Contractor Economic Considerations in Dam Construction

Construction Cost and Design Considerations

Influence of Rapid Construction on Concrete Dam Costs

Engineering and Contracting Procedure for Foundations
The object of this manual, Engineering and Contracting Procedure for Foundations, is to establish fair and equitable practice, and to correct...

Code of Practice
This Code of Practice of the American Society of Civil Engineers is prepared with the hope that it may prove of value to those engaged in construction,...

Railroad Transportation: A Symposium: Railroad Transportation and Owners of Railroad Securities