Phase II Evaluation Findings
The Segmental Concrete Channel Bridge System
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF Innovation Center. This report represents the second component of the...

Protecting Your Work: Balancing the Competing Interests of Ownership
Your firm has invested days, months—perhaps even years—in its latest project. Your staff have poured their thoughts, ideas, and insights into the creation of a bridge, building, overpass,...

Evaluation Findings
the Segmental Concrete Channel Bridge System
Prepared by the Highway Innovative Technology Evaluation Center, a CERF Service Center. This report presents the findings of a HITEC evaluation of...

Evaluation of Abutment Stiffness in a Short Bridge Overcrossing During Strong Ground Shaking

The Art of Infrastructure
Phoenix' capital improvement plan is subtitled Our Share Environment. It requires that one percent of the capital budget go toward artistic input on all infrastructure projects:...

Driving Under a Construction Site
Throughout the summer of 1992, vehicles passed unimpeded through one of the most heavily traveled intersections in Los Angeles County as construction proceeded on a concrete light-rail...

Jet Grouting in Airport Construction

Soilcrete Cut-Off Wall for Undercrossing a Busy Rail Line

Elegant Interchange for Tight Urban Spaces
The Seventh St. underpass, which opened in May of 1987, is a multilevel uban interchange crossing I-10 in the center of Phoenix, Arizona. With little right of way available, the interchange...

Stability of Armour Layers in Rivers
The importance of both the overpassing and the embedding of river bed particles is demonstrated by experiments. When a single layer thick armouring layer of uniform d1...

Climatological Estimates of Evapotranspiration
Interactions between evaporating surfaces and the overpassing air suggest that potential evaporation responds in a complementary way to changes in the availability of water for evapotranspiration...

Particle Overpassing on Flat Granular Boundaries
Sand-sized sediment under certain boundary shear conditions may overpass, i.e., may move as bed load, across a loose, flat boundary of unlike size and density without being deposited,...

Treat on a 120-ft-Span Prestressed Concrete Beam
Tests to destruction of 120-ft-span prestressed concrete beam similar to beams to be used in 4-span overpass at Chiswick, Great Britain; at ultimate load beam failed by crushing of concrete...

 

 

 

 

Return to search