Role of Engineers in Multidisciplinary Hydropower Planning: A Case Study

Site-Specific Probable Maximum Precipitation (PMP): Great Miami River Drainage in Southwestern Ohio

Bridge Design: Reality Bites Back
Many bridge engineers tend to ignore the process nature of reality, the fact that everything in this universe changes from moment to moment. When they are given the responsibility for...

Why are Hydro Projects not being built in the Upper Ohio River Basin?

The Belleville Hydroelectric Project—An Overview

Belleville Powerhouse Electrical Systems and Controls

History of Dolos Armor Cover at Cleveland Harbor, Ohio

Greater Cleveland Retional Transit Authority Walkway to Gateway

A League of Their Own
New baseball stadiums in Cleveland and Arlington, Tex., opening in April 1994, combine the nostalgia of traditional ballparks with state-of-the-art site planning and structural engineering....

Development of an Expert System for Daily Drought Monitoring
A daily drought monitoring system was developed using the Clips Expert System software package. It consists of four components: (1) The knowledge base that contains rules in the form of...

Pavement Treatment in Ohio Transportation System
This paper presents a modification of the original method in which the concept of fuzzy set theory is applied in the calculation of the PCR. Fuzzy numbers are introduced to represent those...

Reservoir Operation by the Use of an Expert System
Most reservoirs, designed for the purpose of flood control, face operational problems during periods of drought. This study uses five indicators, streamflow, precipitation, temperature,...

Daily Procedure for GLFS Nowcasts
The Great Lakes Forecasting System (GLFS) is an integrated system involving three levels of computational power for making predictions. GLFS consists of three-dimensional numerical circulation...

A Nearshore Model for Cleveland CSO Remediation Design Selection
Three models were combined to analyze the fate of Combined Sewer Overflows (CSOs) in the Cleveland, Ohio area. Firstly, a 20 year hindcast of Lake Erie was used to find design storms by...

Effect of Data Sampling Time Resolution on Probability Distribution of Elapsed Time Between Rainfalls
The elapsed time between rainfalls is useful information in statistical forecasting of rainfall and runoff. The probability density function (pdf) of the elapsed time can be determined...

West Columbus, OH LPP Gate Closure Analysis - A Study of the Requirements for Multiple Closures
Providing flood protection by levees and/or floodwalls often requires the use of temporary closures, in lieu of the more expensive relocation of highways and railroads, in order to maintain...

Hocking River Sedimentation Study
The channel improvement project located on the Hocking River in Athens, Ohio is estimated to have prevented over 68 million dollars in flood damages since its completion in 1971. However,...

A Deep Soil Mix Cutoff Wall at Lockington Dam, Ohio

ISTEA Enhances Transportation
The aim of the Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991 was to integrate communities with transportation programs. Engineering professionals now have the responsibility...

Computer-Aided Cleanup
In late 1992, the remedial investigation of Operable Unit 2 at the Department of Energy's Fernald Superfund site in Ohio was in trouble. Despite years of effort-including...

 

 

 

 

Return to search