Subsurface Utility Engineering and Megaprojects: Avoiding Underground Conflicts Helps Speed Project Delivery
Experienced project owners realize that utility conflicts can be risky and pose unexpected impacts on the cost and delivery of projects, especially in urban settings. To help overcome these impacts, Subsurface...

Megaproject Monitoring by Satellite — InSAR-based Settlement-time History: Measuring Hundreds of Thousands of Points, Several Times a Month, Across an Entire City
Satellite-based interferometric synthetic aperture radar, or InSAR, has gained unequivocal importance as a routine and precise monitoring method for large and small areas alike. Historical datasets allow...

Trenchless Goes Hybrid: Old Tricks Are Finding New Applications
The International Society for Trenchless Technology defines trenchless technology as "Underground construction methods of utility installation, rehabilitation, inspection, location and leak detection,...

The investigations: The World Trade Center towers
On Aug. 21, 2002, the National Institute of Standards and Technology announced it would conduct a building and fire safety investigation of the World Trade Center disaster. This investigation was conducted...

IoT and Big Data in Geotechnical Construction: Connecting Drill Rigs to the Cloud
It’s almost impossible these days to escape the fervor and buzz surrounding technologies and concepts such as Big Data, Internet of Things (IoT), Machine Learning (ML), and Artificial Intelligence (AI)....

Site Constraints Complicate a Bulkhead Replacement: It Takes a Team to Overcome the Challenges
North American Aggregates (NAA), a leading supplier of aggregates in the New York area, recently constructed a new processing facility in Perth Amboy, NJ. One of the final components of the new facility...

Beyond the Water’s Edge: Geotechnics in the Wet
Gaining insight into the subsurface and developing an understanding of what’s hidden below ground is a key to the design and construction process. Geotechnical engineers and geologists often develop their...

Poison Oak, Mistakes, and Lessons
When things go wrong in geotechnicalengineering — like ground movements andearthwork construction delays — failureinvestigations are often performed. In a typical geotechnical project, the path is relatively...

ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
The journal will meet the needs of the researchers and engineers to address risk, disaster and failure-related challenges due to many sources and types of uncertainty in planning, design, analysis, construction,...

ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part B: Mechanical Engineering
he ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part B: Mechanical Engineering will serve as a medium for dissemination of research findings, best practices and concerns, and for discussion...

Journal of Transportation Engineering, Part B: Pavements
The Journal of Transportation Engineering, Part B: Pavements will contain technical and professional articles on the planning, design, construction, maintenance, and operation of airport, roadway and other...

Offshore Technology in Civil Engineering
Hall of Fame Papers: Volume 11
Prepared by the Program Committee of the Offshore Technology Conference of the Coasts, Oceans, Ports, and Rivers Institute of ASCE<\p>Offshore Technology...

Geosynthetic Materials Help Build Optimized Infrastructure
In recent years, the world has begun to realize the negative impacts that limited infrastructure can have on economic growth and the well-being of humankind. Our infrastructure challenges...

New Orleans under Reconstruction: The Crisis of Planning, By Carol McMichael Reese, Michael Sorkin, and Anthony Fontenot. Brooklyn, New York: Verso, 2014

Microtunneling Operation
The shaft should provide safe working conditions and fully support the ground. Jacking and receiving shaft support system and sizes are typically determined by the contractor. See Chapter...

Machine Performance
Annular Thickness, Annulus, and Annular Space; Overcut; Slurry or Auger System; Cutter Wheel Design and Select; Slurry Separation Plant; Buried Objects and Obstruction; Steering....

Submittals
The contractor should submit the items listed in the specifications for review and acceptance by the engineer. The submittals are generally divided into preconstruction and postconstruction...

Shafts/Temporary Structures
Shafts should be of a size to accommodate the equipment and pipe selected and to allow for safe working practices. If the shaft must accommodate the permanent works, it is the contractor's...

Construction Support Services
A preconstruction survey of existing structures within the anticipated construction zone of influence should be conducted before any construction begins. A plan for structures that need...

Regulations
The contractor should meet federal, state, and local regulations. The contractor is responsible for jobsite safety....

 

 

 

 

Return to search