Seismic Behavior of Tubular Steel Offshore Platforms

Generation of Wind Waves

Analysis of the Tension Leg Stable Platform

Offshore Technology in Civil Engineering
Hall of Fame Papers from the Early Years: Volume Five
Prepared by the Program Committee, Offshore Technology Conference, of the Coasts, Oceans, Ports, and Rivers Institute of ASCE. This series presents...

Offshore Technology in Civil Engineering
Hall of Fame Papers from the Early Years: Volume Four
Prepared by the Subcommittee on Offshore Technology Conference Support of the Coasts, Oceans, Ports, and Rivers Institute of ASCE. This series presents...

Offshore Technology in Civil Engineering
Hall of Fame Papers from the Early Years: Volume Three
Prepared by the Subcommittee on Offshore Technology Conference Support of the Coasts, Oceans, Ports, and Rivers Institute of ASCE. This series presents...

Fatigue Reliability in Welded Joints of Offshore Structures

Offshore Technology in Civil Engineering
Hall of Fame Papers from the Early Years: Volume Two
Prepared by the Program Committee, Offshore Technology Conference, of the Coasts, Oceans, Ports, and Rivers Institute of ASCE. This series presents...

A Probabilistic Investigation of Foundation Design for Offshore Gravity Structures

Geotechnical Considerations in Foundation Design of Offshore Gravity Structures

Probabilistic Fatigue Analysis of Fixed Offshore Structures

A New Deepwater Offshore Platform – The Guyed Tower

Stability of Offshore Gravity Structures Foundations by the Upper Bound Method

The Siege of Ancient Tyros in 332 B. C.: An Offshore Construction Success

Offshore Technology in Civil Engineering
Hall of Fame Papers from the Early Years
Prepared by the Subcommittee on Offshore Technology Conference Support of the Coasts, Oceans, Ports, and Rivers Institute of ASCE. This series presents...

Inelastic Analysis of Fixed Offshore Platforms for Earthquake Loading

Materials Problems in Offshore Platforms

Applications of Wave-Equation Analysis to Offshore Pile Foundations

The Articulated Stinger: A New Tool for Laying Offshore Pipelines

Construction Factors and Monitoring Methods Relating to the Performance of Ventura Breakwater Core Loc Repair
In 1999 the Los Angeles District of the U.S. Army Corps of Engineers (USACE) repaired the north Ventura breakwater head. The head was rebuilt using 2-ton underlayer stone armored with...

 

 

 

 

Return to search