Eyes in the Heavens: Satellite Technologies in Remote Site Monitoring
Installation and maintenance of instrumentation to monitor geotechnical projects in remote locales is usually more challenging than sites in urban areas for both technical and logistical reasons. In most...

Achieving Success and Avoiding Failures with Permeable Pavements
This chapter provides experienced-based recommendations on how to achieve success with permeable pavements. This information is based on an informational survey completed by designers,...

Construction Support Services
A preconstruction survey of existing structures within the anticipated construction zone of influence should be conducted before any construction begins. A plan for structures that need...

Instrumentation and Monitoring
A detailed plan for monitoring possible ground surface movements caused by the microtunneling operations should be prepared. The plan is typically prepared by the engineer in consultation...

Beach Profile Surveys along the U.S. Pacific Coast: 1945-1947

The Engineering Income and Salary Survey Standard Report
Trends Analysis, Policies, and Practice
The Salary Survey of 2010 is an engineering income and salary survey....

The Engineering Income and Salary Survey
Trends Analysis, Policies, and Practices
The Salary Survey of 2009 is an engineering income and salary survey....

Real-Time Survey Monitoring for Support of Excavation

Current Programs in American Post-Secondary Wood Design Education
Wood engineering has been a requirement in civil/structural engineering education curricula forcenturies. In 1990, a comprehensive survey was conducted of wood engineering educationprograms...

Poetic Crossing
Named for Georgia's first national poet, Sidney Clopton Lanier, the new Sidney Lanier Bridge, spanning the Brunswick River in the city of Brunswick, is an elegant structure...

Nonlocal Integral Formulations of Plasticity and Damage: Survey of Progress
Modeling of the evolution of distributed damage such as microcracking, void formation, and softening frictional slip necessitates strain-softening constitutive models. The nonlocal continuum...

Surveying and Mapping: History, Current Status, and Future Projections
Since the founding of ASCE in 1852, remarkable changes have occurred in all areas of civil engineering practice, including surveying and mapping. Instruments employed in surveying and...

Role of ASCE in the Advancement of Computing in Civil Engineering
Computing has emerged as a major focus area in civil engineering, just as it has in other disciplines. This paper examines the role of the American Society of Civil Engineers (ASCE) in...

Fiber-Reinforced Polymer Composites for Construction—State-of-the-Art Review
A concise state-of-the-art survey of fiber-reinforced polymer (also known as fiber-reinforced plastic) composites for construction applications in civil engineering is presented. The paper...

Monitored Natural Recovery and Dredging Decision Analysis at Bellingham Bay, Washington
The Whatcom Waterway Site, located within inner Bellingham Bay, Washington consists of intertidal and subtidal aquatic lands within and adjacent to the Whatcom Waterway in Bellingham,...

Raising the Bar - 345kV Uprating
The paper presents solutions to increasing the transfer capacity (book rating) of two critical 345kV tie lines. Described are computer modeling techniques using laser survey data coupled...

Using Tracer Response Curves to Quantify Hydraulic and Channel Complexity of Prairie Creek, Northwestern California: Implications for Over Wintering Habitat for Juvenile Coho Salmon
This study measured and compared aspects of channel structural complexity with hydraulic complexity at a range of flows including winter storm flows. Five 200-meter reaches containing...

New Navigation Channel
Among the facilities needed to accommodate Pier 400 at the Port of Los Angeles (POLA) was a new navigation channel to handle the increased container and liquid bulk traffic that the port...

Twenty-First Century Terminal
The Port of Los Angeles is already the busiest container facility in the United States, and the eighth busiest in the world. In 2000 it handled some 112 million tons (102 million Mg) of...

Designing a Web Site
With the advent of prepackaged software programs that practically set up a Web site by themselves, small engineering firms may assume that designing and operating a Web site is a snap....

 

 

 

 

Return to search