Automated Generation of NBI Reporting Fields from Pontis BMS Database
Methods to generate National Bridge Inventory (NBI) condition ratings for deck (Field 58), superstructure(Field 59), substructure (Field 60) and culvert (Field 62) from the bridge database...

Large Truck Impacts on the Highway Infrastructure: The Bridge Dimension
Recent U.S. studies have explored the productivity gains of longer combination vehicles (LCV's) and their impacts on highway infrastructure. The area least explored is LCV operations and...

Tie Model: A Crosstie Replacement Planning and Costing Model
The Tie Model described in this paper is a maintenance planning and life-cycle costing model for wood crossties. The model includes a number of different failure modules to predict crosstie...

Managing a Bridge Program for Scour
Recent events have focused national attention on the need for States to implement a managed program to determine the scour vulnerability of each of its bridges. Since 85% of all bridges...

Maintenance Management of Power Transmission Lines
An adb-based maintenance management system, KUHA, was developed in Finland to enable more efficient maintenance of power transmission lines. The system is used for strategic planning in...

Planning Maintenance and Rehabilitation Activities for Local Railroads
This paper presents a structured approach for planning annual and long range (multi-layer) maintenance and rehabilitation (M&R) activities for local railroads. A method is presented...

Addressing Uncertainties in Flexible Pavement Maintenance Decisions at Project Level Using Bayesian Influence Diagrams
Bayesian influence diagrams are directed acyclic graphs used as a network representation for making decisions under uncertainty. These representation facilitate the assessment of coherent...

Inspection and M&R Decisions for Infrastructure
This paper reviews different possible mathematical formulations for a joint inspection and M&R decision-making model, having various levels of restriction and computational complexity....

Mitigation of Excessive Wastewater Infiltration/Inflow Effects for US Army Installations
Wastewater collection system on military installations require periodic maintenance and repair, and occasionally upgrading. Deterioration of wastewater systems enables the entry of extraneous...

An Overview of Markovian Models for Bridge Management Systems
The typical infrastructure maintenance decision-making environment involves multiples objectives, uncertainty, and dynamics of the most commonly used infrastructure models, which captures...

Deterioration Models for Highway Bridges
Infrastructure management, especially in case of highway bridges, need a realistic and effective deterioration model in order to provide information on the present and future condition...

The Finnish Bridge Management System
A computer-based Bridge Management system, BMS, was designed in Finland by the Finish National Road Administration (FinnRA) to assist in high level bridge policy, long-term planning and...

Fuzzy Sets Model for Evaluation of Bridge Projects
This paper presents the formulation of a computerized decision support system that would aid the bridge engineer in long range planning of bridge funding needs, specially, to select the...

An Application of Scour Hazard Analysis and Management
A phased study for the assessment of bridge scour vulnerability is presented. Its objectives are to: (a) initiate a field assessment program, (b)establish data handling capabilities, (c)...

Implementation of the Indiana Bridge Management System
Management of a bridge system involves a complex decision-making process. A comprehensive bridge management system provides a set of tools that aid this process by selecting improvement...

Establishing a HSGT System Organization
Most of the attention on High Speed Ground Transportation systems thus far has been devoted to their technological, financial and construction aspects, and this was understandable since...

Implementation and Maintenance of a TGV Line
Because of the success of the TGV in France since the opening date in 1981, SNCF plans to implement 2800 miles of new line in the next 20 years. A new line project poses two management...

The TGV Rolling Stock?Its Evolution and Capabilities
The TGV has achieved a revolution in passenger rail service in France and in Europe. The subject of this paper is the TGV rolling stock, the distribution between three generations, the...

Computerized Maintenance Planning for Agency-Managed Irrigation Systems
Computerized maintenance planning has been established to facilitate: (1) preparation of the 'Catch-Up' Maintenance Plan using the field data collected while conducting the Diagnostic...

Steel Penstocks
Steel Penstocks, ASCE Manuals and Reports on Engineering Practice No. 79 covers the design, manufacture, installation, testing, startup, and...

 

 

 

 