Foreign Offices: Management Logistics
This chapter discusses the logistics of establishing an overseas production office....

Logistics Carriers for the First Lunar Outpost
This paper describes that aspect of logistics concerned with the design parameters and operation of hardware that may be used to deliver and protect spares and resupply items for NASA's...

A Comparison of L-Moments with Method of Moments
A comparison of the Conventional Moments Method (CMM) with the L-Moments Method (LMM) for selecting a distribution is made. Five distributions GEV (Generalized Extreme Value), LNO (Lognormal),...

Evaluating Lunar Base Conceptual Designs
A large number of competing lunar base conceptual designs have been proposed in recent years. The range of assumptions and technologies used in these designs makes comparison difficult....

Construction Challenges on Planetary Surfaces
In July 1989 those who advocate a vigorous U.S. space program received a significant boost from the President's declaration that we should return to the Moon, this time to stay, and then...

SEI In-Space Operations and Support Challenges
The initial architectures and mission concepts for Space Exploration Initiative (SEI) are being studied to expand the manned space exploration capability. To support assessment of operational...

Advanced Construction Management for Lunar Base Construction?Surface Operation Planner
The unprecedented task of constructing a lunar base could easily overwhelm any existing terrestrial construction management system. Couple this with the overall need for lunar surface...

Launching Facility Constraints on the Space Exploration Initiative
The Space Exploration Initiative (SEI) proposes large space programs such as a human mission to Mars and the establishment of a lunar base. These programs will require massive logistical...

U.S. Navy Deployable Waterfront Facility
The U.S. Naval Civil Engineering Laboratory (NCEL) has been developing the concept of a Deployable Waterfront Facility (DWF) as part of its technology development programs for the enhancement...

Temporary Facilities?Making It Happen, Organization and Logistics
As construction projects become larger, more complex and are constructed both faster and under more adverse conditions--the use of temporary facilities is more prevalent. Temporary facilities...

Application of Statistical Distribution Theory to Launch-on-Time for Space Construction Logistic Support
The Center for Space Construction (CSC) has acquired historical launch vehicle data for analyzing space launch vehicle logistic support of space construction. This analysis will include...

Normal Accidents and Logistics in Space Operations
Unpredictable systemic accidents, normal accidents, will occur in highly-complex large-scale space systems. To mitigate the catastrophic consequences of normal accidents, containment engineering...

Space Station - New Venture/Old Problem
Four key operations-related costs are associated with the Space Station: (1) transportation, (2) data management, (3) sustaining engineering, and (4) integrated logistics. Life cycle cost...

Logistics Support of Space Facilities
The logistic support of space facilities is described, with especial attention given to the problem of sizing the inventory of ready spares kept at the space facility. Where possible,...

Antarctic Research and Lunar Exploration: Useful Parallels
Review of the process of scientific exploration in the Antarctic may provide insights into areas that might pose problems to man when further exploration of the lunar surface is begun....

Logistics for Structures Sealifted to the Arctic
Sohio has successfully pioneered the development of the Prudhoe Bay reservoir by sealifting prebuilt oil processing facilities from the lower 48 states. The experience thus gained is being...

Predicting Areas of Groundwater Contamination
Logistic regression has been used to estimate the probability that a metropolitan area will contain one or more water supply sites with contamination by one or more of six frequently occurring...

Helicopter-Erected Tower Crane Demolishes Buildings
A signigicant logistics and scheduling problem existed for the demolition of these old buildings and the erection of a new one in the middle of an existing plant. Careful construction...

 

 

 

 

Return to search