Research on the Possibility of Creating a Community Using Water Facilities as Mutual Familiarization Medium

Case Study: Downdrift Benefits Four Miles and Six Years from a Gravelly Beach Nourishment on Lake Michigan
A Corps of Engineers gravel feeder-beach nourishment at New Buffalo, MI, in late 1980 - early 1981 gave an excellent opportunity to observe the downdrift progress of the gravel. This paper...

Changing Socio-Economic Conditions in the Hamilton Harbour (Ontario) Area: Implications for Harbour Remediation
The 1987 Protocol amending the Great Lakes Water Quality Agreement of 1978 called for the preparation of Remedial Action Plans for forty-two Areas of Concern (typically polluted harbours...

Citizen Views on Great Lakes Policy: A Comparison of Canadian and U.S. Publics
This study investigates Canadian and American public opinion concerning the use of public funds to restore and protect Great Lakes coastal areas. Based upon survey data collected among...

Shipwreck Management in Michigan's Great Lakes
From the year 1679, when Sier de la Salle's legendary trading ship, the Griffin set sail and disappeared on its maiden voyage, to 1975 when the Edmund Fitzgerald went down...

Cleaning North America's Beaches?Volunteers Across America Monitor the Quality of Our Coasts
The Center for Marine Conservation (CMC) has established a National Marine Debris Database to involve citizens in the collection of standardized information on marine debris. A comparison...

An Update to CoastWatch?NOAA's New Capability for the Coastal Ocean
The National Oceanic and Atmospheric Administration's (NOAA) CoastWatch project was initiated in August 1988 in response to a red tide event off the North Carolina coast....

Great Lakes Wave Runup Methodology Study
The Great Lakes region has 5,480 miles of U.S. lakeshore. Located along this shoreline are approximately 340 Federal Emergency Management Agency Flood Insurance Study sites with the associated...

Management of Great Lakes' Sandy Barriers: The Conceptual Challenges
Sandy barriers are dynamic, significant, and sensitive resource systems, comprising portions of the 18,000 km of Great Lakes shore. Use, development, and management of these features,...

Longshore Sand Transport Rate Distributions Measured in Lake Michigan
Cross-shore and vertical distributions of longshore sand transport in the nearshore zone were measured in a field data collection project conducted at Ludington, Michigan, on the east...

Neashore Sediment Transport by Slush/Brash Ice in Southern Lake Michigan
Bands of mobile ice are common features in the Great Lakes nearshore zone during the winter months. Samples were collected during December, 1989 to determine the sediment content in the...

The Structural Evolution of a Wave-Current Sediment Concentration Boundary Layer

Spit Formation in Lake and Bay
A technique of superimposing beach profiles, as a method for analyzing the characteristics and deformation process of a sand spit topography, is proposed, and the morphological changes...

Initial Shoreline Response at the Presque Isle Erosion Control Project
Construction of the Presque Isle Shoreline Erosion Control Project in Lake Erie at Erie, PA began October 1989 and consists of fifty-eight offshore segmented breakwaters with beachfill....

Influence of Water-Level Variation on the Performance of Great Lakes Beach Nourishments
In an effort to evaluate the influence of Great Lakes water level change on beach nourishment profile adjustment, an extensive ten year monitoring study was conducted in southern Lake...

Distribution and Grain Sizes of Deposited Reservoir Sediments, Seventy Years after Dam Construction
The Elwha and Glines Canyon Hydroelectric Projects are located on the Elwha River in the northwest portion of the Olympic Peninsula in Washington State. The Elwha Dam was completed in...

Low Flow Impact on Power in the Great Lakes Basin
Approximately 94,400 mW of installed capacity in the Great Lakes Basin could be adversely affected by low levels/flows induced by drought or climatic warming. Methods for evaluating the...

Lake Siskiyou Power Project
The Lake Siskiyou Power Project was constructed at the foot of the existing Box Canyon Dam on the Sacramento River in Northern California. Major project features included the construction...

Digital Governor Application ? Bradley Lake Project
The Bradley Lake Project has two impulse turbines rated at 60 MW each to provide power to the Railbelt region of Alaska. Solid state digital governors are utilized to respond to system...

Operations and Maintenance Manual for Bradley Lake Hydroelectric Project
Bradley Lake Hydroelectric Project is located on the Kenai Peninsula of Alaska. The project consists of two 63 MVA turbine-generators fed via a single 3.5-mile-long penstock. The water...

 

 

 

 

Return to search