Repair�Don't Replace�Cracked Sewer Pipe
Approximately 0.5 mile (0.8 km) of 42 in. (1,07 m) diameter reinforced concrete was installed for a sanitary sewer project when the on site inspector discovered that numerous joints had...

The Use of Joint Reinforcement in Qualifying Masonry Walls in Nuclear Power Plants
Wire joint reinforcement has been traditionally used in block masonry walls for crack control and to provide continuity for multiple wythe walls. In a number of nuclear power plants, vertically...

Union Construction is Fighting Back
To meet the threat of open-shop construction, union labor and contractors in several cities around the nation are working together in joint labor-management committees to improve the productivity...

New Umbrella Society for Engineering is Taking Shape
If all goes as planned (and the prognosis is good), 1980 will see the start of operation of a new umbrella society in engineering. The joint creation of many engineering specialty societies...

County Engineer Throws the Book Away in Intersection Design and Lowers Cost 20%
Article describes the innovative design of a highway intersection that was reconstructed to relieve traffic congestion. The nearest drainage outlet was 2800-ft away and was inadequate,...

Minority Consulting Engineers Speak Out
A sampling of opinion from the point of view of black consulting engineers. Quota systems are discussed as are financial problems, attitudes of banks, joint-ventures, abuse of minority-participation...

Doing Business in Saudi Arabia
The consulting firm or contractor eager to get a piece of the action in Saudi Arabia must be prepared to endure some hardships. Foreigners can't own land but can rent living...

Concrete Replaces Steel in Offshore Coal-Loading Terminal
An open water coal-loading terminal off the east coast of Australia berths 100,000 dwt coal ships. The concrete caissons for the berth were constructed within a drydock and later a breakwater,...

Los Angeles Pioneers Separate Busway
The San Bernardino Freeway Express Busway, a joint project of the Southern California Rapid Transit District and California Department of Transportation, is the nation's first...

A Fail-Safe Subaqueous Concrete Sewer
Describes the design and installation of a unique, tri-gasketed 87-in. (2210 mm) diameter reinforced concrete sewer force main. The total system is approximately 14,000 ft (4,300 m) long,...

Financing and Charges for Wastewater Systems
This joint committee report covers a broad range of relevant issues in financing charges for wastewater systems. Topics include elements and functions of wastewater systems, administrative...

Current Research on Tall Buildings
Abstracts
This report summarizes the results of a worldwide survey of current research on tall buildings conducted by the ASCE-IABSE Joint Committee on Tall Buildings. The Survey was conducted over...

Supplement to Bibliography on Bolted and Riveted Joints
This supplement presents abstracts of articles on mechanically fastened joints that have appeared since the publication of ASCE Manual No .48 which covered work up to September 1966. Altogether,...

Design and Construction of Dams
Reports on current United States practice in the design and construction of arch dams, embankment dams, concrete gravity dams, by subcommittee of the Joint committee....

 

 

 

 

Return to search