An Integrated Knowledge System of Seismic Vulnerability and Risk for Engineered Facilities
This paper describes an integrated knowledge system for the assessment of the seismic vulnerability and risk of engineered facilities. The system integrates knowledge from many fields...

Numerical Evaluation of Energy Release Rates
Numerical studies are described that evaluate the total energy release rate, GT, for quasi-static, Mode I cracks using two-dimensional finite-element...

Integrated Information Systems, The Key to Coastal Zone Management

A Parallel Partitioning Method for Large-Scale Circuit Simulation
In this paper, we discuss a partitioning method for large-scale circuit in parallel computer simulation. The partitioning method maps the sparse and irregular circuit equations to a special...

Computer Aided Design of Monolithic Integrated Circuits
An algorithm has been developed to relocate the sites of electrical components and integrated circuits. The process simulates site location changes in order that path lengths of conductors...

Integral Length Scale in Sediment-Suspending Flow
The Clauser integral length scale is an adequate scaling parameter for velocity defect profiles in clearwater and sediment-suspending flows in open channels. Velocity defect profiles plotted...

Convolution-Integral Modeling of Non-Equilibrium Sediment Transport
In transient process of sediment transport due to unsteady or/and nonuniform flow or discontinuity of boundary condition, non-equilibrium process appears and it sometimes plays an important...

Simulations of Multireservoir System Operation
Simulation modeling has evolved from a direct examination of operating policies into operational decision support systems, integrated multiple use expansion planning systems and special...

Cofferdams: An Integral Part of Small Hydro Design
Cofferdam construction costs can be a major factor in the viability of a small hydro development. For this reason, cost-effective design and construction are critical. A cost-effective...

Development of Integrated Knowledge System for Earthquake Engineering

Systems Integration for Effective Project Planning

System Integration Through a Database Management System

Object Management in an Integrated Design System

Hard- and Software Requirements for CADD as the Basis of an Integrated System in Small Civil Engineering Firms

The Application of Integrated, Computerized Planning Tools to Assist in the Analysis and Design of Automated Transit Systems in Major Activity Centers

Integration of APM Systems With Florida High Speed Rail

Issues in Computer Based Design/Construction Integration
Design and construction processes are widely regarded as too splintered for industry effectiveness. By improving communication and process integration, reduced costs and improved facilities...

Integration of Microcomputer Applications—Current and Future Approaches

Integrating Voice Recognition Systems with the Collection of Project Control Data
The Construction Industry in the 1990's will be dominated by emphasis on Productivity, Competitiveness and Innovation. Success or failure in these areas lies in one word, Technology, and...

An Integrated Site Controller-Network Monitoring System for Small Scale Hydroelectric Sites
Over the past decade more and more small scale hydroelectric power developers have faced the question of the economic feasibility of installing microprocessor based control systems for...

 

 

 

 

Return to search